Network Equipment Depot Update to NOS Pt. Reyes, CA 2004. Parts status News Items Complaints. Parts Status. PART AVAILABLE REPLACED last 12 mos motor boxes 45 235 sensors 54 222 event recorders 39 49 gage clocks 77 101 gage mechanisms 51 19
E N D
Network Equipment DepotUpdate to NOSPt. Reyes, CA 2004 • Parts status • News Items • Complaints
Parts Status PART AVAILABLEREPLACED last 12 mos • motor boxes 45 235 • sensors 54 222 • event recorders 39 49 • gage clocks 77 101 • gage mechanisms 51 19 ==== 626 YEAR00/01 01/02 02/03 • motor boxes 96 122 144 • sensors 99 142 171 • event recorders 55 37 43 • gage clocks 121 137 116 • gages 20 17 16 ==== ==== ==== TOTAL391 455 490
We are not always holding our own with provision of motor boxes and sensors to sites. FGS mini-NED below targets. NEDM below targets. In the last quarter we lacked replacement parts for approximately 8 site days. Mini-NED weekly inventory. News items
Starting in Fall 2003 we were pairing motor boxes to sensors when effecting repairs due to the lack of failure resolution. • Working with our two vendors we THINK we have discovered that a transistor responsible for the sensitivity of the motor unit was being replaced with one with incorrect low gain characteristics. PN4122 seems to be helping. • We are working on tapering this back to individual repairs now. The story is still out. News items
New vendor RIES LABS evaluated components and repair histories and began making repairs in 4q03. To date they have repaired ~30 each boxes and sensors. • SUMMARY- RIES LABS is competitive in terms of cost and repair turnaround time. Advanced in context of creative perspective on the repair and retrofit of the collector components. • Two special projects. News items
Two special projects. • WHY?! News items
Two special projects. • We will live with the current NADP collector design for 5 years. News items
RIES Sensor heater and thermistor reconfiguration News items
RIES Sensor heater and thermistor reconfiguration News items
RIES Sensor heater and thermistor reconfiguration News items
RIES Sensor heater and thermistor reconfiguration News items
RIES Sensor heater and thermistor reconfiguration • Cost estimates coming • My goal is to build 5 and test/implement News items
RIES Motor box circuit board News items
RIES Motor box circuit board News items
RIES Motor box circuit board • Microprocessor controller • Less “knob and tube” wiring (3 vs. 9 connections at power bus) • More efficient repair • Equal sensitivity • Cost estimates coming News items
The monies allocated from the Executive Committee to start another round of hybrid clock rebuilds has been expended. • Outside machining • 40 gear plates modified so far • Costs decreasing • Goal was to do 50 clocks • We have 10 total completed now with 30 more in the assembly line. • Would like to move to external battery pack. News items
Repeat failures at sites seem to indicate that AC power systems are fatiguing. Surge protector duplex outlets (at $50 each) purchased to trial at 5 sites. No results. • The electro-magnetic solenoids we use to repair and manufacture event recorders are no longer being made to our specifications. Retro-fit with radio-controlled modeling components failed. News items
NED IS UNDER FUNDED Complaints