90 likes | 210 Views
TriP-t & AFEII status. Paul Rubinov. AFE and CFT. 8 photons. VLPC. 9 o K. (x512). 80 fC. Central Fiber Tracker cylinder. DISCR. ADC. Discriminator output every 396 nsec for L1. Amplitude signal readout for L3 and offline. AFE. STOP. Overview. Ancient history.
E N D
TriP-t & AFEII status Paul Rubinov
AFE and CFT 8 photons VLPC 9o K (x512) 80 fC Central Fiber Tracker cylinder DISCR ADC Discriminator output every 396 nsec for L1 Amplitude signal readout for L3 and offline AFE
STOP Overview Ancient history build/test TriP for 132ns running AFE1 problems TriP works very well at 396ns and adding time info can help CFT a lot. Build AFEII prototype Build TriP-T Summer 04 milestone Aug 04 Build AFEII (with time Info)by end of 2005
AFEII proto current status Schematic design is 99% complete. …an internal review has been completed. The review committee made a number of suggestions (minor) and these are being implemented. Layout of the board is about 80% complete… However, this is going very slowly. Still 3 weeks work left. This puts the work about 3-6 weeks behind schedule. Has impact on D0. Test of AFE II prototypes with beam this August is now NOT likely. Specifications for the new microcontroller code requirements are 75% complete… Design of the FPGA is 75% complete…
TriP • The existing TriP ASIC (7000 die on hand) • Lots of testing over about 18 months- described inFermiTM 2226, 2227 and 2228
TriP-t: the new idea • About 1% additional components: • 7bits t-info offline: 120ns full scale=> 2ns time => ~35cm resolution in Z
TriP-t current status • The chip designers are chip designing. • End date is given as Aug ’04 • The new chip is the “critical path” item for the project • Assuming D0 makes decision to use Tript • Some prep work going on now • We will need new packaging • We had some concerns about features used on the new chip, but where not used on the old (current!) TriP chip.
TriP-t prep work • Bench testing • New package