1 / 9

Paul Rubinov

TriP-t & AFEII status. Paul Rubinov. AFE and CFT. 8 photons. VLPC. 9 o K. (x512). 80 fC. Central Fiber Tracker cylinder. DISCR. ADC. Discriminator output every 396 nsec for L1. Amplitude signal readout for L3 and offline. AFE. STOP. Overview. Ancient history.

Download Presentation

Paul Rubinov

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TriP-t & AFEII status Paul Rubinov

  2. AFE and CFT 8 photons VLPC 9o K (x512) 80 fC Central Fiber Tracker cylinder DISCR ADC Discriminator output every 396 nsec for L1 Amplitude signal readout for L3 and offline AFE

  3. STOP Overview Ancient history build/test TriP for 132ns running AFE1 problems TriP works very well at 396ns and adding time info can help CFT a lot. Build AFEII prototype Build TriP-T Summer 04 milestone Aug 04 Build AFEII (with time Info)by end of 2005

  4. AFEII proto current status Schematic design is 99% complete. …an internal review has been completed. The review committee made a number of suggestions (minor) and these are being implemented. Layout of the board is about 80% complete… However, this is going very slowly. Still 3 weeks work left. This puts the work about 3-6 weeks behind schedule. Has impact on D0. Test of AFE II prototypes with beam this August is now NOT likely. Specifications for the new microcontroller code requirements are 75% complete… Design of the FPGA is 75% complete…

  5. TriP • The existing TriP ASIC (7000 die on hand) • Lots of testing over about 18 months- described inFermiTM 2226, 2227 and 2228

  6. TriP-t: the new idea • About 1% additional components: • 7bits t-info offline: 120ns full scale=> 2ns time => ~35cm resolution in Z

  7. TriP-t current status • The chip designers are chip designing. • End date is given as Aug ’04 • The new chip is the “critical path” item for the project • Assuming D0 makes decision to use Tript • Some prep work going on now • We will need new packaging • We had some concerns about features used on the new chip, but where not used on the old (current!) TriP chip.

  8. TriP-t prep work • Bench testing • New package

More Related