CHAPTER 5 Activity-Based Cost Systems
A Review: Direct and Indirect Cost • Direct cost: cost that are traceable to a product, activity, or department (a cost object). • DM&DL • Indirect cost: cost that are not traceable to a cost object. Instead, this type of cost is normally common to more than one cost objects and needs to allocated. • OH, selling costs, general & administration costs. • Indirect cost needs to be allocated among the cost objects.
TERMS USED IN COST ALLOCATION • Cost pools • grouping of a set of homogeneous costs whose total is allocated using one allocation base. • Cost pools can be organized along • departmental lines, e.g. Maintenance, Personnel depts. • major activities, e.g. equipment setups, inspections. • Cost object • something that you are trying to estimate the cost of, e.g., product, department, project, customer, etc. • For example, if computer costs are allocated to contracts, the contracts are the cost object
TERMS USED IN COST ALLOCATION • Cost driver • something that cause cost to change, e.g., pounds of direct material, # of setups, # of inspections, etc. • Allocation base • the denominator used to assign cost. This can be a cost driver, or something convenient, e.g., # of units, machine/ labor hours. • An allocation base relates cost pool to the cost objects
Historical Origins of Cost Allocation Methods Traditional volume-based costing (peanut butter costing) Original ABC: introduced in the 1980s Time-driven ABC (TDABC): A contemporary version of ABC introduced by Dr. Robert S. Kaplan and Dr. Steven Anderson in 2004.
Traditional Costing vs. ABC • Traditional costing • spreading common cost evenly over units, products, departments, or other volume-based allocation basis (Peanut-butter costing) • under costing (estimated cost<actual cost), resulting in under pricing and losing money; • over costing (estimated cost>actual cost), resulting in over pricing and losing units of sales. XYZ company example (handout)
Activity-Based Costing (ABC) Activity-based cost systems have been developed to eliminate distortion Activity-based cost (ABC) assign resource expenses to activities
Activity Cost Drivers Activity cost drivers represent the quantity of activities used to produce individual products:
Original ABC vs TDABC Kaplan and Anderson (2004) Article (handout) E5-25 Pg 200