1 / 41

MISO Integration Training

MISO Integration Training. Level 100 – Transmission Service Registration. Last material update: 03/06/2013. Course Description. 1.

sani
Download Presentation

MISO Integration Training

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MISO Integration Training Level 100 – Transmission Service Registration Last material update: 03/06/2013

  2. Course Description 1 • This is a broad overview of MISO’s Transmission Service Registration process. The following slides present a high-level overview of transmission service options and some potential impacts. 2 • This presentation is intended for those individuals seeking a basic understanding of MISO’s Transmission Service Registration process and is not intended to expand into detail on the concepts presented here. 3 • For additional detail and training, interested parties should reference the TSR integration document that is posted on the MISO OASIS node. This includes additional detail that expands on this presentation’s content. 4 • Frequently used terminology, along with reference-links to MISO documentation and contacts, is included in this presentation.

  3. Transmission Service Integration Overview The Basics of MISO Transmission Services Transaction Terminology… Drive-WithinMISO Drive-Into MISO Drive-ThroughMISO External origination and Sinks External MISO origination and Sinks internal to MISO External origination but Sinks internal to MISO • Transmission Service Transaction Paths Drive-Out from MISO MISO origination but Sinks External

  4. Transmission Service Integration Overview • The Basics of MISO Transmission Services-Firm Point-to-Point…

  5. Transmission Service Integration Overview • The Basics of MISO Transmission Services-Non-Firm Point-to-Point…

  6. Transmission Service Integration Overview • The Basics of MISO Transmission Services-Network Integration…

  7. Transmission Service Integration Overview • The Basics of MISO Transmission Services-Transmission Rates… Existing 2012 Additions

  8. Transmission Service Integration Overview • The Basics of MISO Transmission Services-Transmission Settlements…

  9. Transmission Service Integration Overview The Basics of MISO TSR Integration… MISO Tariff Expansion

  10. Transmission Service Integration Overview The Phases of MISO TSR Integration…

  11. Transmission Service Integration Options Transmission Service Options (by path, excludes partial-path)… * Point-to-Point is still an option, but it is not commonly chosen

  12. Transmission Service Integration Options Partial Path… Consistent with previous MISO new member integrations

  13. Agenda Reference Partial Path Example 1 – MISO to Southern Company… Transaction is from MISO to SOCO • Existing Reservations: • MISO OASIS Reservations • Source: NIPSCO • POR: NIPSCO • POD: EES • Sink: SOCO • Entergy OASIS Reservations • No reservation • Step 1: • Reservation Changes Upon Integration*: • Source: NIPSCO • POR: NIPSCO • POD: AMMO • Sink: AMMO • Step 2: • Customer can choose to delete the reservation or keep it * CPNode names not yet established

  14. Agenda Reference Partial Path Example 2 – MISO to Southern Company… Transaction is from MISO to SOCO • Existing Reservations: • MISO OASIS Reservations • No reservation • Entergy OASIS Reservations • Source: AMRN • POR: AMRN • POD: SOCO • Sink: SOCO • Step 1: • Reservation Changes Upon Integration: • Source: EEA.GeneratorName* • POR: EEA* • POD: SOCO • Sink: SOCO • Step 2: • This reservation stays. It will still enable the customer to move power from MISO to SOCO * CPNode names not yet established. This is an example of a generator in Entergy Arkansas

  15. Transmission Service Integration Options Transmission Service Integration-Unconfirmed TSRs…

  16. Transmission Service Integration Options Grandfathered Agreements…

  17. ARR / FTR and TSR Integration Impacts on FTRs / ARRs

  18. ARR / FTR and TSR Integration Mechanisms for Obtaining ARRs/FTRs… • Transmission Service Eligible for obtaining FTRs/ARRs in Allocation

  19. ARR / FTR and TSR Integration FTRs / ARRs are Awarded Through a Series of Processes… • The Monthly FTR Auction follows the Annual FTR Auction which follows the Annual ARR Allocation. • MISO first runs a Simultaneous Feasibility Test (SFT) to award ARRs for all 4 seasons, Peak and Off-Peak • Auctions are conducted for Peak and Off-Peak for each of four seasons • After the Annual FTR Auction, the Monthly FTR Auction is held

  20. Customer Registration Decision Tree & Timeline Transmission Customer RegistrationDecision Tree and Timeline

  21. Customer Registration Decision Tree & Timeline Transmission Customer Types… Transmission customers who join MISO as certified Market Participants, as a result of the MISO Southern Region integration, fall into the following categories: 1a 1b 2a 2b 3 4 *New customers looking to do business on the Entergy OASIS are not guaranteed to be certified by 6/1/2013

  22. Customer Registration Decision Tree & Timeline Transmission Customer Type Decision Tree… Transmission customers can determine what category they fall into by working through this decision tree…

  23. Customer Registration Decision Tree & Timeline Asset Owners and Long-Term Firm Customers Timeline by Customer Type… Based on type, transmission customers will have to perform different tasks (and on different timelines) to be eligible to interact in the MISO footprint 2a 4 1a 1b 2b 3                                     *Dates assume a Module B-1 go-live of 7/1/13 – will change if the target date changes

  24. Customer Registration Decision Tree & Timeline SPP Reserve Sharing Group (RSG) and Short-Term Firm Customers Timeline by Customer Type… Based on type, transmission customers will have to perform different tasks (and on different timelines) to be eligible to interact in the MISO footprint 1a 1b 2a 2b 3 4 *Dates assume a Module B-1 go-live of 7/1/13 – will change if the target date changes

  25. TSR Conversions TSR Conversions Overview… There will four distinct types of TSR conversions that may occur as part of the process of standing up Module B-1. The timing of these conversions will vary and may not apply to all entities as outlined in the table below.

  26. FAQs Frequently Asked Questions

  27. FAQs Frequently Asked Questions (1 of 3)…

  28. FAQs Frequently Asked Questions (2 of 3)…

  29. FAQs Frequently Asked Questions (3 of 3)…

  30. List of Reference Materials and Contacts… • Links • https://www.misoenergy.org/WhatWeDo/StrategicInitiatives/Pages/EntergyIntegrationTraining.aspx • Course Catalog • Training Calendar • Available Training for This Topic • https://www.misoenergy.org/Training/Pages • Level 100 Introduction to MISO and Markets • Level 100 Transmission Settlements • Level 100 Tariff Administration (Open Access Transmission and Energy Markets Tariff MISO) • Level 100 Transmission Pricing: Tariff Attachment O • Level 100 Auction Revenue Rights and Financial Transmission Rights • Level 200 Transmission Settlements • Level 200 Market Participant and Asset Registration • Level 200 Auction Revenue Rights and Financial Transmission Rights • Documents • Business Practice Manuals (BPM) • https://www.misoenergy.org/Library/BusinessPracticesManuals • BPM-001 Market Registration • BPM-013 Module B – Transmission Service • BPM-004 FTR and ARR • MISO Tariff (EMT) • https://www.misoenergy.org/Library/Tariff • Contacts • MISO Client Relations • 866-296-6476 • clientrelations@misoenergy.org

  31. Registration Timeline Registration Timeline for MPs with Entergy Transmission System TSRs (1 of 3)…

  32. Registration Timeline Registration Timeline for MPs with Entergy Transmission System TSRs(2 of 3)…

  33. Registration Timeline Registration Timeline for MPs with Entergy Transmission System TSRs(3 of 3)…

  34. Appendix: ITC ITC Appendix

  35. Appendix: ITC ITC Overview: Stages…

  36. Appendix: ITC ITC Overview: Stage 1…

  37. Appendix: ITC ITC Overview: OASIS Setup in Stage 1…

  38. Appendix: ITC ITC Overview: Stage 2…

More Related