1 / 1

Proposed Transition Phases and Groupings

Proposed Transition Phases and Groupings. Once Member Section is created and Core is transitioned, domains transition independently. Final. Scope. Draft. Converge. 0. Linked Data Platform WG. Core 3.0. Change Management 3.0. Asset Management 3.0. 1a. Configuration Management.

Download Presentation

Proposed Transition Phases and Groupings

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposed Transition Phases and Groupings Once Member Section is created and Core is transitioned, domains transition independently Final Scope Draft Converge 0 Linked Data Platform WG Core 3.0 Change Management 3.0 Asset Management 3.0 1a Configuration Management OSLC Member Section Quality Management 3.0 1b Technical Architecture TC Automation 3.0 2a Change and Configuration Management TC Requirements Management 3.0 2b Quality and Automation Management TC Architecture Management 3.0 2c Requirements and Architecture Mgnt TC Estimation and Measurement 3 Performance Monitoring 3.0 Project and Portfolio Management TC Resource Reconciliation 3.0 4 Integrated Service Management TC (DMTF?) Event Monitoring 3.0 5 PLM/ALM Domain Specific / Other Standards Body 1

More Related