10 likes | 115 Views
Proposed Transition Phases and Groupings. Once Member Section is created and Core is transitioned, domains transition independently. Final. Scope. Draft. Converge. 0. Linked Data Platform WG. Core 3.0. Change Management 3.0. Asset Management 3.0. 1a. Configuration Management.
E N D
Proposed Transition Phases and Groupings Once Member Section is created and Core is transitioned, domains transition independently Final Scope Draft Converge 0 Linked Data Platform WG Core 3.0 Change Management 3.0 Asset Management 3.0 1a Configuration Management OSLC Member Section Quality Management 3.0 1b Technical Architecture TC Automation 3.0 2a Change and Configuration Management TC Requirements Management 3.0 2b Quality and Automation Management TC Architecture Management 3.0 2c Requirements and Architecture Mgnt TC Estimation and Measurement 3 Performance Monitoring 3.0 Project and Portfolio Management TC Resource Reconciliation 3.0 4 Integrated Service Management TC (DMTF?) Event Monitoring 3.0 5 PLM/ALM Domain Specific / Other Standards Body 1