An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. North Shore at Canton Beau Menard Structural Option Advisor: Professor Parfitt The Pennsylvania State University Architectural Engineering Senior Thesis

  2. North Shore at Canton Beau Menard Structural Option Table of Contents: • Building Overview • Problem Statement • Solution Overview • Structural Redesign • Steel Solution • Pre-cast solution • Construction Management Issues • Material Costs • Construction Durations • Conclusion • Acknowledgements • Questions

  3. BuildingOverview North Shore at Canton Beau Menard Structural Option • Location • Baltimore, MD • 2300 block of Boston Street • Residential Structure • 1 level covered parking • 3 levels of living units • 60,000 sq ft

  4. BuildingOverview North Shore at Canton Beau Menard Structural Option • Structural System • Foundation • Pre-cast concrete piles • Concrete strength, f’c = 7000 psi • Grade 60 reinforcing steel • Parking level • Floor system- 12” pre-cast planks w/ 4-1/2” topping • Steel Columns and Girders • 8” pre-cast planks w/ 2-1/2” topping

  5. BuildingOverview North Shore at Canton Beau Menard Structural Option • Structural Systems • Living Units • Bearing/Shear wall system • Steel Studs • ½” Gypsum Sheathing • Floor system • 16” deep pre-engineered wood floor trusses, spaced 16” o.c. • ¾” OSB topping • Roof system • Pre-engineered roof trusses, spaced 24” o.c.

  6. ProblemStatement North Shore at Canton Beau Menard Structural Option • Inherent Moisture Problem • Structural Integrity

  7. North Shore at Canton Beau Menard Structural Option SolutionOverview • Structural Solution • Steel Redesign • Combination Moment and Braced Frame • Open web steel joists • Pre-cast Concrete Redesign • Shear-wall lateral system • Pre-cast columns and girders • Pre-cast planks

  8. North Shore at Canton Beau Menard Structural Option StructuralRedesign • Design Loads (IBC 2003 & ASCE 7-02) • Live Load • 40 psf • Roof Live Load ~ 20 psf • Snow Load • 20 psf • Lateral Loads • Wind Load ~ 20 psf (steel structure) • Seismic Loads as noted (concrete structure) • Dead Loads • Structure Weight ~ varies • Roof Dead Load ~ 20 psf • MEP and Ceiling ~ 20 psf

  9. North Shore at Canton Beau Menard Structural Option StructuralRedesign • Steel Design • Floor System • Open Web Steel Joists • 16k4 (25’ max span, 3’ spacing) • Allowable Load ~ 313 plf • Total Load ~ 270 plf • Metal Decking • 19 gauge (3 span) • 1-1/2” x 6” • Light weight Concrete topping • 2-1/2” topping w/ gypsum ceiling

  10. North Shore at Canton Beau Menard Structural Option StructuralRedesign • Steel Design • Initial frame systems • Moment frame vs. Braced frame • Combination Frame • Moment and Braced Connections

  11. North Shore at Canton Beau Menard Structural Option StructuralRedesign - Steel • Main Lateral Force Resisting System • 5 Combination Frames • Columns • w 10x49 (typ) • Girders • w 21x50 (int) • w 18x35 (ext) • Bracing elements • w 8x24 (typ) • Moment Frame • Columns • w 10x49 • Girders • w 18x40 1st Floor

  12. North Shore at Canton Beau Menard Structural Option StructuralRedesign - Steel 2nd Floor • Main Lateral Force Resisting System • 5 Combination Frames • Columns • w 10x49 (typ) • Girders • w 18x35 (int) • w 16x26 (ext) • Bracing elements • w 8x24 (typ) • Moment Frame • Columns • w 10x49 • Girders • w 18x40

  13. North Shore at Canton Beau Menard Structural Option StructuralRedesign - Steel 3rd Floor • Main Lateral Force Resisting System • 5 Combination Frames • Columns • w 10x49 (typ) • Girders • w 16x26 (int) • w 16x26 (ext) • Bracing elements • w 8x24 (typ) • Moment Frame • Columns • w 10x49 • Girders • w 18x40

  14. North Shore at Canton Beau Menard Structural Option StructuralRedesign - Steel 4th Floor • Main Lateral Force Resisting System • 5 Combination Frames • Columns • w 10x49 (typ) • Girders • w 22x55 (typ) • Moment Frame • Columns • w 10x49 • Girders • w 18x40

  15. North Shore at Canton Beau Menard Structural Option StructuralRedesign - Steel • Lateral Deflection

  16. North Shore at Canton Beau Menard Structural Option StructuralRedesign - Steel • Gravity Frame • Columns • w 10x49 (typ) • Girders • w 16x26 • w 18x40 • w 21x44 • w 24x55 • Bracing elements • w 8x24 (typ)

  17. North Shore at Canton Beau Menard Structural Option StructuralRedesign - Steel • Foundation Impact • Slight Increase in axial loads • Lateral Load transfer • Pile Capacity • 130 tons Compression • 30 tons tension

  18. North Shore at Canton Beau Menard Structural Option StructuralRedesign – Pre-cast • Typical Frame Layout • Foundation Impact • Shear walls • Columns • Girders

  19. North Shore at Canton Beau Menard Structural Option StructuralRedesign – Pre-cast • Shear Walls • Location • Long walls • Short walls • Loads Applied • Seismic Controls • Reinforcement • Spacing ~ 18” • ρ = 0.0025 • # 6 bar

  20. North Shore at Canton Beau Menard Structural Option StructuralRedesign – Pre-cast • Columns • Level • 3-12”x12” • 2-12”x12” • 1-14”x14” • Reinforcement • γ = 0.6 (conservatively) • ρ = 0.03 • 3 -# 7 bars / face

  21. North Shore at Canton Beau Menard Structural Option StructuralRedesign – Pre-cast • Girders • Interior • 12”x14” • Moment Reinforcement • 3-#9 (bot) • 4-#9 (top) • Shear/torsion Reinforcement • #3 bars @ s = 7” • Perimeter • 10”x12” • Moment Reinforcement • 2-#5 (bot) • 2-#5 (top) • Shear/torsion Reinforcement • #3 bars @ s = 6”

  22. North Shore at Canton Beau Menard Structural Option StructuralRedesign – Pre-cast • Floor System • Pre-cast Planks • Span ~ 25’ • 8”x4’ SpanDeck –U.L.-J917 • Flexure 4 - 1/2" Φ allowable load = 110 psf total load = 90 psf • 2” concrete topping

  23. North Shore at Canton Beau Menard Structural Option StructuralRedesign – Pre-cast • Foundation Impact • Greatly Increase in axial loads • Lateral Load transfer • Shear wall connections

  24. North Shore at Canton Beau Menard Structural Option • Current system • Pier cost ~ $ 1,000,000 • Town home cost ~ $448,600 • Includes structure and facade • Steel System • Frame Cost ~ $650,000 • Includes framing and floor system • No additional pier cost • Pre-cast System • Frame cost ~ $750,000 • Includes framing and floor system • Pier cost increased ConstructionManagement – Cost

  25. North Shore at Canton Beau Menard Structural Option ConstructionManagement – Durations • Current system • Pier construction ~ 5 months • Town home construction ~ 5 months • Includes structure and facade • Steel System • Frame construction ~ 4 months • Includes framing and floor system • No additional pier construction • Pre-cast System • Frame construction ~ 6 months • Includes framing and floor system • Additional pier construction required

  26. North Shore at Canton Beau Menard Structural Option Conclusions / Recommendations • Steel Redesign • Advantages • Light Weight • Less impact on foundation • Cost effective • Shorter construction durations • Disadvantages • Complex connections • Additional moisture protection • Additional fire proofing • Pre-cast Redesign • Advantages • Moisture resistant • Fire resistant • Reduce lateral members • Disadvantages • Increased structure weight • Complex connections • Greatly impacts foundation • Increased cost • Slightly increased construction durations

  27. North Shore at Canton Beau Menard Structural Option Acknowledgements Don Taylor ~ DW Taylor Architects and Associates Jim Diepold ~ Whitney, Bailey, Cox, Magnani Friends and Family AE Faculty

  28. North Shore at Canton Beau Menard Structural Option Questions The All Knowing Man of Steel Man of Steel