1 / 6

Constraints on ttH analysis

Constraints on ttH analysis. Samir FERRAG. Introduction. Theoretical uncertainties: PDFs: 40+1 CTEQ6 PDF sets Factorisation and renormalisation scale: 0.5 m 0 < m <2 m 0 AlpGen v:2.06 used Cross sections computation: 100M events for each PDF set  0.05% stat uncertainty

sarah-todd
Download Presentation

Constraints on ttH analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Constraints on ttH analysis Samir FERRAG

  2. Introduction • Theoretical uncertainties: • PDFs: 40+1 CTEQ6 PDF sets • Factorisation and renormalisation scale: 0.5m0<m<2m0 • AlpGen v:2.06 used • Cross sections computation: • 100M events for each PDF set  0.05% stat uncertainty • 7 Hours on Desktop (8h on my laptop) • Feasibility of ttH • Extract the constraints on the background uncertainty • If feasible: define the priorities on real data: • PDF, Background, ttH…

  3. Theoretical uncertainties on ttbb sttbb= 2.55 +/- 6% (PDFs) +/- 55% (energy scale) PDF: can be irreducible and constitutes a serious source to constraint the analysis

  4. Constraint on ttH Sensitivity: Constraint:

  5. Constraint on ttH for 10fb-1 S/B 5s 4s Requested S/B For 3s significane For 6% PDF uncertainty 3s S/B=0.14 From Markus cuts 2s systematic uncertainty on B (%) 6% of PDF uncertainties (on ttbb+ttjj) Need 1 to 2 % of accuracy On background to reach 2s significance

  6. Constraint on ttH for 100fb-1 S/B 5s 4s 3s Requested S/B For 3s significane For 6% PDF uncertainty 2s S/B=0.14 From Markus cuts systematic uncertainty on B (%) 6% of PDF uncertainties Need 4% of accuracy On background to reach 3s significance

More Related