An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lean RepairWorkshop BriefTrident Refit Facility Presenter: [Name] Lean Coordinator: [Name] 8 OCT 03

  2. FY03 Workshop Focus Insert an interesting photo of lean in action & delete this callout • Code 700 Small Optics Repair: Big Eyes • [Project #2] • Georgia Tech - Economic Development Institute • [Describe picture to the right] Brief to CLF N43

  3. What Was Accomplished • Major anticipated outcomes: • Eliminate downtime of processing equipment • Increase capacity • Streamline repair part ordering process • Reduce product delivery time • Decrease costs • Describe what was learned: • Optical shop lacks adequate space • Internal & external information flow can be improved • Optical shop design inhibits repair process and traffic flow • Current procurement method can be improved Brief to CLF N43

  4. What Was Accomplished • [Describe process changes made & where now documented] • [Indicate if Coordinator PD has been modified/created] • Eleven personnel trained • 100 Percent trained with PRD > one year Brief to CLF N43

  5. Waste • Waste Identified & Removed: • Identified opportunity for reducing optical instrument receipt processing time (2-9 days) to 1 day • Identified opportunity to improve the parts ordering process • Identified opportunity to eliminate use of clean room to reduce contamination and improve traffic flow • Identified opportunity to improve delivery route from Supply • Identified opportunity to redefine high bay floor space, redesign shop floor space and instrument storage space • Assume your new process runs with constant workload for a year. Describe the potential savings in man years and material dollars. • Man years: [ ] • Material $: [ ] Brief to CLF N43

  6. Comments from Workshop Participants • Good: [List positive feedback in bullets] • Other: [List “needs improvement” feedback in bullets] Brief to CLF N43

  7. “Leaner” than a Thousand Words! • [Provide several picture slides as appropriate to show essence of workshops] • [Before/After conditions] • [Indicate what is being pictured] Brief to CLF N43

  8. “Leaner” than a Thousand Words! Before After Brief to CLF N43

  9. Planned FY04 Projects • [Code 400 Title]: • [Code 300 Title]: • [Code 300 Title]: • [Code 700 Title]: In bullets, describe the focus of the project, expected outcomes, milestones including the approximate start date and intended outside support (if any). Insert a second slide if necessary. Delete this callout block on the final slide. Brief to CLF N43

  10. Assistance Needed • [In bulleted format indicate the FY04 assistance needed and desired from Fleet to support lean implementation at your activity.] • [Indicate what it would take to implement lean faster in your activity.] Brief to CLF N43

  11. Lessons Learned, Comments & Recommendations • [Your opportunity to provide candid feedback to Fleet and to pass along suggestions to other lean coordinators] Brief to CLF N43