WELCOME First World Bank Mission. FIRST WORLD BANK MISSION PHYSICAL PROGRESS UNDER NHP,PUDUCHERRY. By M.RAVISANKAR , JOINT PROJECT CO-ORDINATOR Puducherry Water Resources Organization National Hydrology Project , Puducherry.
PROJECT LOCATION Project area Tamil Nadu Area = 490 Sq. Kms Pondicherry Region= 299 Sq. Kms Total Project Area = 789 Sq. Kms Geographic Location Longitude : 79 58”.00 to 79 80” 50 Latitude : 11 75” 00 to 12 00” 00 2
FUNDS RECEIVED & EXPENDITURE DETAILS TILL DATE First Tranche under NHP -2016-17 Rs. 60,00,000 on 12.12.2017. vide file No.X-96049/1/2016-NHP/561-574. Dated 12.01.2017,Director NHP.
FUNDS RECEIVED & EXPENDITURE DETAILS TILL DATE First Tranche under NHP -2017-18 Rs. 79,00,000 on 19.06.2017. vide file No.X-96049/1/2016-NHP/3411-3414. Dated 19.06.2017,Director NHP.
Status of various studies / pdsunder nhp-PUDUCHERRY Conduct of Purpose Driven Study on the following topics under NHP,which was mentioned in the PIP. Detailed Proposal preparation work under progress . After completion, the same will be submitted to MOWR through NPMU New Delhi for approval.
Status of data entry in e-swis • Request letter to be sent to the CWC for getting the user ID , and password for surface water monitoring data to update in E-swis. Awaiting the user ID , and password. • Request letter sent to the PWD –(ID) for surface water monitoring data from PWD and the same will be update in E-swis.
Status of hydrometstation (sw ) PROPOSED LOCATION FOR DIGITAL RAIN GUAGE TO BE INSTALLED UNDER NHP. PROPOSED LOCATION FOR AWLR TO BE INSTALLED UNDER NHP. Sites selected and marked in the map , the same has been forwarded to CE,CWC for finalization of the sub committee and MoWR. Awaiting for site approval from the CWC.
Status of hydrometstation (gw )contd: • The State level Technical committee discussed about the five locations of the proposed observation tubewells to be constructed under NHP that were visited by the members on 01.07.2017. The following are the locations of proposed tubewells; • The Committee has agreed and finalised the above locations along with the depth and diameter of the proposed observation tube wells under National Hydrology Project in Puducherry Region. Awaiting for site approval from the National Sub Committee CGWB &NPMU , New Delhi.
Status of state wris • Data related to water resources , including data on water quality, in a standardized format, will be available under one roof for the policy makers and officials involved in the management of water resources, aiding them in well informed future policy decisions related to water management in Puducherry region. • The data generated under this project will be provided to the various water users departments for formulation of various schemes related to water supply and management . • The academicians and scholars from research institutes and researchers from the NGO sector, are expected to benefit a lot from the outcomes of the project. • Industrialists may utilize the data in their consideration for expansion plans such as establishment of additional units in the region.
Status of public finance management system (pfms) • The entries of expenditure incurred in PFMS will be completed by September -2017.
Any other issues The following item cost has to be revised & Approved as per present rates and estimates as detailed below;