1. Results of call for DS, CNI, AM 2. Information on next call for TA, I3, CA, AM 3. Towards Research Infrastructures in FP7 Presentation by P. Moschopoulos OPTICON, Grenoble, 11-12 October 2004.
E N D
1. Results of call for DS, CNI, AM 2. Information on next call for TA, I3, CA, AM 3. Towards Research Infrastructures in FP7 Presentation by P. Moschopoulos OPTICON, Grenoble, 11-12 October 2004
1. Results of call for: Design Studies,Construction of New Infrastructures andAccompanying Measures
FP6 actions in favour of RI • Actions implemented: • 1. Transnational Access to RI • 2. Integrating Activities: • 2.1. Integrated Infrastructure Initiatives • 2.2. Coordination actions • 3. Electronic Communication Network Development • 4. Design studies in preparation of new RI • 5. Development (Construction) of new RI • 6. Accompanying Measures • To be covered: all fields of S/T
FP6-2003-Infrastructures-4Call outline • Indicative budget: 70 million €; • to cover all fields of S&T; • Call deadline: 4 March 2004; • Proposals received: 121 (93 submitted by EPSS); • 3 ineligible; • Proposals evaluated: 118; • 55 Design studies (DS); • 34 Construction of new infrastructures (CNI); • 29 Accompanying measures (AM).
2. Next call for: Transnational Access, Integrating Activities andAccompanying Measures
FP6 actions in favour of RI • Actions implemented: • 1. Transnational Access to RI • 2. Integrating Activities: • 2.1. Integrated Infrastructure Initiatives • 2.2. Coordination actions • 3. Electronic Communication Network Development • 4. Design studies in preparation of new RI • 5. Development (Construction) of new RI • 6. Accompanying Measures • To be covered: all fields of S/T
FP6-2004-Infrastructures-5 Call outline (1) • Publication date: 4 November 2004 • Call deadline: 3 March 2005 • Remote evaluation: March - April 2005 • Panel meetings: Brussels, 9-13 May 2005 • Results: available in July • Negotiations: Sept. 2005 - Dec. 2005 • First contracts: January 2006 • All fields of S&T are covered
FP6-2004-Infrastructures-5 Call outline (2) • Indicative budget: 145 million € • Integrating Activities (CA, I3): 126 million € • Transnational Access (SSA): 17 million € • Accompanying Measures (SSA): 2 million € • Expected proposals: 150 • Integrating Activities (CA, I3): 50 • Transnational Access (SSA): 70 • Accompanying Measures (SSA): 30 • 3 ranking lists
FP6-2004-Infrastructures-5Evaluation procedure • Expert evaluators: 90 (+ Chairman + Independent Observer) • 5 thematic sub-panels for Integrating Activities and Transnational Access • One multidisciplinary sub-panel for Accompanying Measures
Main differences between call 1 and the new call 5 • I3: • All three activities (Networking, Access, Joint Research) are mandatory • AM: • Round-table workshops not supported • General: • Final threshold increased • Some specific evaluation criteria modified (see revised Work Programme) • Results from previous calls taken into account
Summary of FP6 support to RIBudget increased from 655 to 738 M€ • First call for TA, IA: 190+35 M€ • First calls for Géant / Grids: 150 M€ (Remaining to allocate: 80 M€ for a “Consolidation” call and a 2nd “Grids” call) • First call for DS, CNI, AM: 70+20 M€ (Remaining to allocate: 48 M€ to a new call or funding of more proposals) • Last call for TA, IA, AM: 145 M€
From FP6 to FP7:European Strategy Forum on RI • Objectives • Support a coherent and strategy-led approach to policy making on RI in Europe • Facilitate multilateral initiatives for the development of RI: best use of existing infrastructures and creation of new ones • Achievements • Strategy roadmaps and coordination: neutron sources, free electron lasers, marine science, social sciences infrastructures • Future: reinforcement and consolidation of ESFRI role • Coherent strategic agenda, improved working methods, common approaches, multilateral initiatives • Contacts with EIRO forum and other stakeholders
First thoughts • Continuation of the FP6 actions on RI • Discussion on the actions related to the construction and functioning of new infrastructures of EU interest • through a ‘TEN’ – like mechanism ? • taking into account strategic criteria on: • a priority list • the location of new RI • Perspectives of collaboration with the EU Structural funds and the EIB
A “top-down” approach • Support for the development of future RI of EU interest based on: • a strategic, long term vision and identification of priority needs for large, new or upgraded RI in the next 15-20 years: roadmap(s) • more targeted support for specific RI projects • increased use of financial engineering to support new RI • In consultation with ESFRI • In close cooperation with EIRO forum, ESF,and other potential stakeholders
Strategic Roadmap(s) • Guiding Principles: • Clear methodology for elaborating the roadmap(s) • Transparency and impartiality • Support by all stakeholders • Endorsement by the Council of Ministers • Periodic revision(s) • Criteria for inclusion: • New infrastructures (or major upgrades) • Scientific importance and excellence • Endorsement by the EU scientific community • Technology feasibility study exists • Justification for EC intervention • Criteria for prioritisation: • Timeliness and readiness for construction • Management and long-term budget estimates • Potential impacts and long term user needs • International added value
Proposed priority list of new RI Council Resolution European Commission Member states Stakeholdersincl. EIROs Inclusion in FEDERRELEX strategic plans Inclusion in national Programmes Inclusion in Specific RTD Programme(s) Projects EIB
FP7 and after:Levels of support at project level FEDERBEIAgencies PrivateOther M€ Construction FP Timeline: 20 to 50 years Preliminary studies Design studies Running costs, upgrades and interconnections With continuous national support, also for running costs
Next Steps • Consolidation of approaches: Autumn 2004 • Working groups & task forces: Winter 2004 - Summer 2005 • First elements for an EU draft roadmap: Summer 2005 • Commission draft communication: Autumn 2005 • Specific programme: Spring 2006
Further Information • General information on research including FP6 • http://europa.eu.int/comm/research • Information about research programmes • http://www.cordis.lu • Information on FP6 infrastructures • http://www.cordis.lu/infrastructures • Information on call FP6-2004-Infrastructures-5 • http://fp6.cordis.lu/infrastructures/calls.cfm