An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kinder Morgan Silver Canyon Pipeline Business Overview ACC Workshop NOI February 13, 2004

  2. Overview • Map • Markets • Supply Basins • Timeline

  3. Las Vegas Blanco Needles Albuquerque Topock Proposed Copper Eagle Storage Blythe/ Ehrenberg Phoenix Blythe Energy Power Plant Harqualhala San Diego West Phoenix Palo Verde Arlington Valley Mesquite Redhawk Panda Gila River Plant Silver Canyon Pipeline Market Hub Power Plant 3rd Party Pipeline Tucson El Paso Silver Canyon Pipeline

  4. Markets • Arizona • Phoenix area • Utility • LDC (2 proposed interconnects with SWG) • Power Plants: Hoping to serve the 6300 MW of new generation near Palo Verde • California (Ehrenberg) • SoCalGas • Baja Norte

  5. Supply Basins • Rocky Mountains (TransColorado) • Significant increase in Piceance/Paradox production over next 5 years • TransColorado 125,000/d expansion to San Juan Hub 4th Qtr. 2004 • San Juan • Slight production decline over the next 10 years, but increased south flow from Rockies will fill the gap

  6. LNG Access from Baja • Firm transportation is offered from supply sources at Ehrenberg (LNG) to markets East of California (Phoenix) • Pipeline segment from Phoenix to Ehrenberg will be bi-directional • 300,000 MMBtu/d

  7. Timeline • Open Season Closed April 30, 2003 • Mid-2006 In-Service date (depends on customer needs)

  8. Here’s what you get with Kinder Morgan • Flexibility • Contractual flexibility • Seasonal contract volumes, sculpted contract volumes • Receipt to delivery point pathing • Alternate receipt and delivery points (including out of the path) • Primary firm transportation from Ehrenberg to Phoenix area • Fully segmented, Order 637 compliant • Operational flexibility • 16/24 hour gas day

  9. How we are different from other expansion projects • Kinder Morgan has strong balance sheet which allows flexibility when raising capital for expansions/acquisitions • Access to the Rocky Mountain, San Juan Basins (vs. Permian) and LNG • Lower fuel • Pipeline industry experience • Commercial • Construction and Operations

  10. Contact InformationBusiness Development Team • Steven M. Harris, Vice President • steve_harris@kindermorgan.com • 713-369-9214 • Lorraine M. Lindberg, Manager • lorraine_lindberg@kindermorgan.com • 713-369-9277 • Kimberly S. Watson, Director • kimberly_watson@kindermorgan.com • 713-369-9233