An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MIPA Progress PresentationFor SERENA Progress meeting, Santa Fee, May 2008Prepared by Johan Svensson and Stas Barabash

  2. Outline • Status in Chandrayaan-1 configuration • MIPA Status • Budgets (Mass, Power). • Action item addressed during progress meeting 2008-02-13

  3. MIPA status (Ch1 configuration) SARA FM (including SWIM - MIPA in Chandrayaan-1 configuration) completed, calibrated and delivered to ISRO (Indian Space Research Organization) Bangalore, India. SWIM, CENA and DPU successfully integrated and tested on Chandrayaan-1 S/C.

  4. MIPA status (Ch1 configuration) SARA package integration on Chandrayaan 1 SWIM on C1 CENA DPU SWIM

  5. MIPA status (1/2) • DDM model delivered to IFSI (Feb. 2007) • Finalization of the mechanical interfaces with ELENA is on-going • Sensor mechanical design completed. • Latest data package delivered 2007-09-24 during D-ISRR-2. • Last EID-B update delivered 2007-12-20. • Funding confirmed

  6. MIPA status (2/2) • Since February 13 2008 progress meeting, most MIPA efforts regard the thermal design. • Decision to go for hot design was taken. Ti, macor and high temperature coating. • Thermal tests of the coatings are planned in Mercury solar simulation chamber in Bern mid June, and at ESTEC. • Manufacturing of STM starts mid May.

  7. MIPA Budgets Sensor flight configuration mass: 194g. 4g increase since progress meeting 2008-02-13 due to radiator re-design Electronics flight configuration mass: neutral Power: neutral since D-ISSR (SWIM FM based)