Purpose:

Modification Proposal Mod_03_14 Change in Timeline for Submission of MO Report on Annual Capacity Exchange Rate. Purpose: To amend the Code to reflect the current practice for the publication of the Annual Capacity Exchange Rate (ACER), which has been in operation for a number of years.

sean-fox
Download Presentation

Purpose:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Modification ProposalMod_03_14 Change in Timeline for Submission of MO Report on Annual Capacity Exchange Rate

  2. Purpose: • To amend the Code to reflect the current practice for the publication of the Annual Capacity Exchange Rate (ACER), which has been in operation for a number of years. • Currently, the ACER to apply for the coming Year is published in December. • The Code requires publication 4 months before start of year.

  3. Modification ProposalMod_04_14 Change to Uplift Parameters Determination Timeline

  4. Purpose: • To allow the RAs to change the Uplift Parameters from time to time instead of the current Code requirement that they change at the start of a year. • “Time to time” consistent with TSC timing for Policy Parameters • With this Modification Proposal, Parameters will continue to be determined 4 months before implementation.

  5. Rationale: • Initial RA analysis in 2013 suggested that amending the Uplift parameters could achieve a reduction in SMP without undue distortion of the profile. • If this is the case the RAs would look to make a change in advance of year end.