SAP C_TPLM22_67 Certification Questions Answers [PDF]

Start Here--- http://bit.ly/2NSZpPO ---Get complete detail on C_TPLM22_67 exam guide to crack Project System. You can collect all information on C_TPLM22_67 tutorial, practice test, books, study material, exam questions, and syllabus. Firm your knowledge on Project System and get ready to crack C_TPLM22_67 certification. Explore all information on C_TPLM22_67 exam with number of questions, passing percentage and time duration to complete test.

seemaiyerr
Download Presentation

SAP C_TPLM22_67 Certification Questions Answers [PDF]

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ABSTRACT Get complete detail on C_TPLM22_67 exam guide to crack Project System. You can collect all information on C_TPLM22_67 tutorial, practice test, books, study material, exam questions, and syllabus. Firm your knowledge on Project System and get ready to crack C_TPLM22_67 certification. Explore all information on C_TPLM22_67 exam with number of questions, passing percentage and time duration to complete test. www.erpprep.com SAP C_TPLM22_67 Certification Questions SAP Project System Certification Latest Questions Answers

  2. Project System - C_TPLM22_67 PDF Introduction to SAP Certified Application Associate - Project System with SAP ERP 6.0 Exam Project System (C_TPLM22_67) preparation guide helps you to get focused on exam. This guide also helps you to be on C_TPLM22_67 exam track to get certified with good score in the final exam. C_TPLM22_67 Project System Exam Summary ●Exam Name: SAP Certified Application Associate - SAP Project Systems with SAP ERP 6.0 EHP7 ●Exam Code: C_TPLM22_67 ●Level: Associate ●Exam Price: $550 (USD) ●Duration: 180 mins Cloud Platform Integration 1

  3. Project System - C_TPLM22_67 PDF ●Number of Questions: 80 ●Passing Score: C_TPLM22_67 - 55% ●Reference Books:PLM210, PLM220, PLM230 ●Schedule Exam:SAP Training ●Sample Questions:SAP PS Certification Sample Question ●Recommended Practice: SAP PS Certification Practice Exam Exam Syllabus: C_TPLM22_67 SAP Certified Application Associate - Project System with SAP ERP 6.0 1. Project Structures Name the components of Work Breakdown Structure, Network and activities, Milestones Books: PLM210 2. Material Explain Work breakdown structure BOM, BOM PS Interface, component assignment in the network, material procurement Books: PLM220 3. Resources Describe how the Resource Planning process integrates with HCM Books: PLM220 4. Dates Describe the importance of various dates which can be tracked for projects Books: PLM220, PLM230 5. Cost and Budgets Describe procedures for establishing budgets and reporting costs. Books: PLM230 6. Revenues and Payments Describe the characteristics of Revenues & Payments. Books: PLM230 Cloud Platform Integration 2

  4. Project System - C_TPLM22_67 PDF 7. Reporting Determine general reporting requirements and reporting requirements for cost centers. Configure cost center reporting and create report painter reports Books: PLM220, PLM230 SAP C_TPLM22_67 Certification Sample Questions and Answers To make you familiar with Project System (C_TPLM22_67) certification exam structure, we have prepared this sample question set. We suggest you to try our Sample Questions for PS C_TPLM22_67Certification to test your understanding of SAP C_TPLM22_67process with real SAP certification exam environment. C_TPLM22_67Project System Sample Questions:- 01. Most of the reports in the SAP Project System can be refreshed without exiting or closing the report. Which report must be restarted to update the displayed data? Please choose the correct the answer. a) Hierarchical Reports b) Individual Overviews c) Reports by Cost Element d) Structure Overview Answer: a 02. You have created a network with successive activities. After scheduling the network, the Gantt chart shows that every activity has the same earliest start and earliest finish date as the network header. What could be the reason? Please choose the correct answer. a) The control key is set to no scheduling. b) The scheduling type is set to capacity requirements only. c) The normal duration of each activity is missing. d) There is a loop in the network. Answer: b Cloud Platform Integration 3

  5. Project System - C_TPLM22_67 PDF 03. A customer wants to maintain basic data and dates of a WBS element on the same tab. Also, basic start and basic finish should be mandatory fields. What do you recommend? There are 2 correct answers to this question. a) Define Layout Detail Screen for WBS to specify customer-specific tabs. b) Define Create User-Defined Fields for WBS to specify the mandatory fields. c) Define Field Selection for WBS to specify the mandatory fields. d) Define Table Settings for WBS to specify customer-specific tabs. Answer: a, c 04. You want to extrapolate basic dates from lower to higher-level WBS elements. Which planning method do you choose? Please choose the correct answer. a) Bottom-up b) Strict bottom-up c) Free planning d) Top-down Answer: a 05. Can the user status forbid business transactions that the system status allows? Please choose the correct answer. a) No, user status can only create a warning. b) Yes, by creating an appropriate status profile. c) Yes, if the status number of the user status is defined with higher priority. d) No, system status has a higher priority than user status. Answer: b 06. You work with Project Builder (CJ20N) and want to use standard templates in your project structure. Which standard templates can you use? Please choose the correct answer. a) Standard time scheduling b) Standard Bill of Material (BOM) c) Standard cost planning d) Standard Milestones Answer: d Cloud Platform Integration 4

  6. Project System - C_TPLM22_67 PDF 07. When using budgeting and active availability control, which business transactions affect the current budget? There are 3 correct answers to this question. a) Cost element planning b) Original budget c) Revenues d) Transfers e) Supplements Answer: b, d, e 08. You have implemented automatic requirements grouping for projects. Once you check the materials turbine and fittings you realize that the requirements are grouped for turbine but not for fittings. What might be the reason? Please choose the correct answer. a) The grouping indicator of the top WBS element is set to a single MRP Group. b) The network is set to no grouping for specific MRP Groups. c) The MRP Group for fittings is deactivated for grouping. d) The project definition is set to no project stock. Answer: c 09. Your projects consist of WBS elements, several networks, and subnetworks. What are the advantages of new overall network scheduling (CN24N) instead of the old overall network scheduling (CN24)? There are 3 correct answers to this question. a) Scheduling of subnetworks and subordinate internal orders b) Introduction of a configurable level concept for the targeted selection of c) Scheduling that takes available capacities and material availability into d) Improve performance through the targeted selection of subnetworks to be e) Detailed subnetwork monitor Answer: b, d, e 10. You want to confirm working hours to a WBS element using Cross Application Time Sheet (CATS). However, once you enter the WBS element and the working hours in CATS you receive an error message. What could be the reason? Please choose the correct answer. a) The system status created is active. b) The system status master data locked is activate. c) You are not the responsible person for that WBS element. d) The confirmation exceeds the budget assigned to the WBS. Answer: a Cloud Platform Integration 5