170 likes | 304 Views
Deutsche Endevor Nutzer Konferenz. April 21-25, 2002 in Orlando mehr als 10000 Teilnehmer mehr technische Sessions Gute Mischung. BrightStor™ Portal Centralized Enterprise Storage Management Wireless Network and Device Management e Trust™ 20/20 Super-Visual Security Management
E N D
April 21-25, 2002 in Orlando • mehr als 10000 Teilnehmer • mehr technische Sessions • Gute Mischung
BrightStor™ Portal Centralized Enterprise Storage Management • Wireless Network and Device Management • eTrust™ 20/20 Super-Visual Security Management • CleverPath™ Portal 4.0 • AllFusion™ Integrated Application Life Cycle Management
CARE • 184 Teilnehmer • 18 Staaten • 50 % neue Präsidenten • Alle Nationalen User Groups
Dar Process • Wahl der 10 wichtigsten Dars • Besprechung mit den CA-Verantwortlichen • Umbennung • Telefonkonferenzen • Usergroup Charter • Motivation • Web Site Prüfung: www.cast.org/bobby/
1. Issues with SMP/E installation • a. PTFs installed or Full installation • b. If true SMP/E is used as designed, it would not be necessary to reinstall the complete product. • c. Prior to installation it is required to edit a member to customize it to company standards. Then additional editing is required of the FMID before ACCEPTing it into SMP/E. Therefore the editing processes are required twice before applying into target zone.
1. Issues with SMP/E installation • d. SMP/E installation should know PTF Co-requisites and pre-requisites • e. Should you ”never accept PTF’s, if accepted they can not be backed • f. If identified (pre and co requisites) we should be able to backout all of them together. • g. It is required to Reject Usermods (C1DEFLTS, ect) before applying new.
2. STARCC • a. Unable to find PTF’s without solution numbers • b. Are there different search engines that we cannot access, where CA does have access? • c. Eliminate ”Garbage lines” from downloaded solutions, to make available for SMP/E installation without modifying. • d. Received solution with ”Non-GA” prerequisite
3. Webstation • a. Can’t find it on CA Web Page • b. Require the capability to review Batch output messages. (is available in 4.0) • c. Need more functionality (accepting DARs for product) • d. Usage with LSERV is very-very slow.
4. Education • a. Terri discussed how can CA make education more appealing to the users. Several Presidents agreed to be on a committee to help with educational input, such as creating an Advance Administration class
5. Guesstimate when 4.0 will be available in Beta • a. End of May, Ross Markly shared information on 4.0 from a customer’s end
6. Endevor and Harvest • a. Need a fully integrated tool to manage it all (Unix and MF) • b. Issues with integration. • c. Several companies are offering solutions
7. Support had improved in Australia, and Europe. • 8. Problems with 64 bit address, user getting S0c4 (ruled out Optimizer problems).
Die I-Nuge Mannschaft 2002 • Präsident: Michael Davidson • Vize Präsident: Rodger Henry • D.A.R. Administrator: Chris Murphy • Shareware Administrator John Stafford • Internet WebMaster James Borders • European International Liaison Norbert Fluegel • Asia / Pacific International Liaison Arthur Mihailidis
Informationen im Web • Teilnehmer http://ca.com/caworld/2002/care/attendees.htm • Präsentationen http://ca.com/caworld/2002/care/presentations/ • Weitere Links • http://agendas.ca.com/agendas/ • http://ca.com/caworld/2002/highlights/ • http://ca.com/caworld/2002/media_gallery/
Die nächsten Termine • CARE 2003 in Las Vegas • 10.7.2003 - 11.7.2003 • CA-World 2003 in Las Vegas • 13.7.2003 - 17.7.2003