York County Sewer Authority Capstone Turbine Installation

York County Sewer Authority Capstone Turbine Installation. Central Pennsylvania AEE Meeting January 26, 2012. Old Technology - IC Engine System. High Maintenance High Emissions Loud Antiquated Controls Waste Disposal (engine oil every 4 months).

selah
Download Presentation

York County Sewer Authority Capstone Turbine Installation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. York County Sewer AuthorityCapstone Turbine Installation Central Pennsylvania AEE Meeting January 26, 2012

  2. Old Technology - IC Engine System • High Maintenance • High Emissions • Loud • Antiquated Controls • Waste Disposal (engine oil every 4 months)

  3. New Technology – “Jet Engine” Capstone Turbines • All American Made Equipment • Simple Installation • Low Maintenance • Low Emissions • Quiet

  4. Installation

  5. Results Old System New System • 1,530 kW of IC engines • Produced 80 kW /1000 CF • Lack of control of electric production • Couldn’t load follow • Saved money but not as much as the turbines • Produced 80 Tons of NOx/CO/VOC • 1,600 kW of microturbines • Produces 120 kW / 1000 CF • Has tighter control • Can load follow • Generates an additional $40,000 in revenue • Produces <1 Ton of NOx/CO/VOC