Base Case Coordination System RFP

Base Case Coordination System RFP. David Franklin BCCS System Review Group/Planning Tool Subcommittee (PTS) Pre-Bid Conference Salt Lake City, Utah. BCCS Pre-Bid Conference Agenda. Introductions Meeting Arrangements BCCS Purpose Overview Planning Model Operating Planning Interface

sen
Download Presentation

Base Case Coordination System RFP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Base Case Coordination SystemRFP David Franklin BCCS System Review Group/Planning Tool Subcommittee (PTS) Pre-Bid Conference Salt Lake City, Utah

  2. BCCS Pre-Bid ConferenceAgenda • Introductions • Meeting Arrangements • BCCS Purpose Overview • Planning Model • Operating Planning Interface • Change Control Methodology • PTS’s Evaluation Methodology of Vendor Proposals • Responses to Vendors’ Questions on BCCS RFP • Next Steps • Meeting with Final Vendors • Kick Off Meeting

  3. Purpose of RFP • Centralized Data Base • Improve Communications • Improve Data Accuracy • NERC Requirements (MOD Standards) • Load & Resources • Increase number of base cases per year • Produce Base Cases Independent of Power Flow Platform • BCCS Integration • Bus/Branch Model and Node/Breaker Model • Topology Processor

  4. BCCS – Node-Breaker Integration • Planning models have Bus-Branch structure • BCCS will be able to hold Node-Bkr and Bus-Br data • Planning data can be produced from node-breaker data • BCCS data will be used in operation models as projects are constructed and are placed in-service • Operations/Planning coordination is required

  5. Development Milestones Weights

  6. RFP Distribution • Operating Committee • Planning Coordination Committee • Technical Studies Subcommittee • System Review Work Group • Interested Vendors, System Integrators, and Consultants • Seven vendors responded they intend to bid

  7. Pre-Bid Conference • Existing processes and problems • BCCS Structure and use • Explanation of Project concept • BCCS RFP response review process • Next Steps after review process • SRWG, TSS, PCC approval of selected vendor