1 / 15

PSI-Center goal

PSI-Center goal. Needs all our features verified and validated We have made great progress but have more to do. Planned status of code development by March 2018. X: published validation V: installed and verified D: development work in progress P: proposed new work. Goals of meeting.

senta
Download Presentation

PSI-Center goal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PSI-Center goal • Needs all our features verified and validated • We have made great progress but have more to do

  2. Planned status of code development by March 2018 X: published validation V: installed and verified D: development work in progress P: proposed new work

  3. Goals of meeting Quantitative validation Review validation work Code work and validation plans Make plans for developing most features by March 2018. Estimate needed resources: Postdocs, Gradstudents. Future mission and scope of PSI-Center Additional results

  4. Present status of 3D code development X: published validation V: installed and verified D: development work in progress P: proposed new work

  5. Suggested status of code development by March 2015 X: published validation V: installed and verified D: development work in progress P: proposed new work

  6. Planned status of code development by March 2018 X: published validation V: installed and verified D: development work in progress P: proposed new work

  7. Scope increase needed to meet goals

  8. PSI Center needs to change its mission • Mission: Contribute to the development of future predictive simulation of large whole experiments and support small experiments that address fusion issues. • Mission may demand an increase in scope.

  9. PSI-Center supports the advance of tokamaks • Contributes to future predictive simulation of large whole tokamaks • Advance validation science • Develop validation processes • Simulate whole plasma experiments • Develop both physical and numerical code features needed for whole tokamaks • Support small experiments that address tokamak issues

  10. PSI-Center develops and validates code features needed for future whole tokamak and future EPR simulations

  11. PSI-Center experiments contribute to solution of tokamak and future EPR issues

  12. Increased scope of PSI-Center • Need to trade accuracy for speed (implicit time step?) • Need to develop error bars on computational results • Contribute to the development of validation science • Validate with more experiments • Have our features by March 2018

  13. We have to be more rigorous • Make validation a hard science • BODs might help. • Validate with experimental data before you interpret experiment • Need quantitative agreement for valid interpretation • Logically you can not “learn” about an experiment from an invalid simulation

  14. Summary • We contribute to future predictive simulation of large whole tokamaks • Advance validation science and processes through simulation of whole plasma experiments • Develop both physical and numerical code features needed for whole tokamaks • Support small experiments that address tokamak issues • Need to be able to trade speed for accuracy with error bars • Need to validate at higher parameters • Validate with any experiment • DOE small experiment get priority • We have to be more rigorous

  15. Is NIMROD pessimistic? • Low Temperatures on SSPX • Low current gain on HIT • Low closed current on NSTX • Reconnection is slower even in two-fluid.

More Related