1 / 27

PM ConSim for Worldwide Joint Training and Scheduling Conference

PM ConSim for Worldwide Joint Training and Scheduling Conference. Rick Copeland rick.copeland@us.army.mil DPM Constructive Simulation 407-384-3652. COL Karen Saunders karen.saunders@us.army.mil PM Constructive Simulation 407-384-3650. PEO Mission

seoras
Download Presentation

PM ConSim for Worldwide Joint Training and Scheduling Conference

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PM ConSim for Worldwide Joint Training and Scheduling Conference Rick Copeland rick.copeland@us.army.mil DPM Constructive Simulation 407-384-3652 COL Karen Saunders karen.saunders@us.army.mil PM Constructive Simulation 407-384-3650

  2. PEO Mission To Provide Responsive Interoperable Simulation, Training, and Testing Solutions and Acquisition Services for the Warfighter and the Nation. PEO Vision The Center of Acquisition Excellence Providing Simulation, Training, and Testing Solutions for the Nation. PEO DPEO (SES) Business Operations Customer Support Project Support Special Staff End 4.0 Shape a “world class” workforce with acquisition, functional and leadership skills Acquisition Center Director/PARC DPEO Programs PM TRADE PM CATT Associate Director Contracting Operations Associate Director Policy & Systems PM ConSim PM ITTS PM Field OPS PM FF(S) PEO STRI Organization

  3. PM ConSim COL KAREN SAUNDERS (PM) MR. RICK COPELAND (DPM) TRAINING SIMULATIONS OFFICER LTC STEVE FRENCH PdM Warrior Training Integration (WTI) LTC KEITH FLAIL (PdM) Vacant (DPdM) PdM OneSAF LTC ROB RASCH (PdM) MR. JOHN LOGSDON (DPdM) Joint and Coalition Simulation Systems (JCSS) Vacant (Director) DON PHILPITT (APM) APM JLCCTC DEVELOPMENT MR. MIKE HADDAD APM JLCCTC PRODUCTION MR. ROY WHITEHEAD CBCSE ConSim Organization JCSS

  4. PdM Warrior Training Integration (WTI) - Provide persistent and integrated LVC training enablers that allow Commanders to plan and execute realistic Battle Command, Intelligence, and Joint Training to prepare their soldiers and staffs for combat. APM JLCCTC (Production) - Focused Management of both the Multi-Resolution Federation and Entity Resolution Federation compositions of the Joint Land Component Constructive Training Capability (JLCCTC). APM JLCCTC (Development) – Focused Management on Objective Simulations targeted at training commanders and staffs at Brigade and above. PdM OneSAF – Develop, field and configuration manage the OneSAF constructive simulation for the US Army. The Training Simulation Office executes the SIMCI project for HQDA and serves as the designated FA57 proponent within PEO STRI. Joint Coalition Simulation Systems (JCSS) - Develop, acquire, field and sustain interoperable simulation environments in support of Joint and Coalition Forces and the Nation. Joint Coalition Simulation Systems (JCSS) - Develop, acquire, field and sustain interoperable simulation environments in support of Joint and Coalition Forces and the Nation. ConSim Mission ConSim Vision: To be the Recognized Leader for Providing Constructive and Integrated Simulation Environments. ConSim Mission: To Provide Operationally Relevant Constructive and Integrated Simulation Environments for the Warfighter and the Nation. JCSS

  5. LIVE • HITS • CONSTRUCTIVE • JLCCTC • OneSAF LVC-IA • VIRTUAL • AVCATT • CCTT/RVTT • CFFT • C2 • ABCS • GCCS BLUF: The LVC-IA will enable seamless LVC & C2 connections LVC-IA Increment 1 Concept • Increment 1 Focus • - Brigade Combat Team (BCT) • Home Station Training • BCTC is LVC Hub

  6. LVC-IA • Requirement/Capabilities: • LVC-IA integrates L-V-C systems and ABCS enabling unit and battle staff configurable tailored combined arms and joint collective training at multiple echelons. • LVC-IA provides appropriate 'conditions' for realistic training, increasing unit force effectiveness and readiness. • It will create a Joint, interoperable, seamless architecture to support training environments for Current and Future Forces in the Institutional, Operational, and Self Development Domains. • LVC-IA will support development of an LVC Integrated Training Environment (ITE) • Current Activities: • Acquisition documentation in support of Milestone B decision and program initiation • ACAT III program, MDA delegation to PEO STRI • Materiel Development Decision (MDD) - June 2009 • Anticipated MS B in September 2009 • Contract actions: • Industry Day – May 2009 • Request for Information – June 2009 • Request for Proposal – October 2009 • Anticipated Contract Award – January 2010 • Live, Virtual, Constructive Integration Cell (LVCIC) • Technological and Programmatic Risk Reduction • LVC-IA Site Survey and Prioritization Visits FT Lewis FT Campbell FT Carson FT Knox FT Drum FT Bragg FT Stewart FT Bliss Camp Shelby OCONUS Fielding US Army Pacific (USARPAC) US Army Europe (USAREUR) FT Hood

  7. BCTP TSS Convergence Roadmap 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 BCT & Below V1.0 V2.0 V3.0 V4.0 V5.0 V6.0 OneSAF OneSAF R & D JNEM ISM LOGFED V5.0 WARSIM R&D – BCT V4.0 DBST JCATS EADSIM FIRESIM TACSIM SIMPLE MUSE VISION XXI V6.0 V5.0 DBST TACSIM ERF ERF V6.0 JLCCTC LCMP/P3I V3.0 Div & Above MRF CBS TACSIM ACTF CBS TACSIM CSS/TSS RTM MUSE AAR TOOLS V6.0 Obj MRF V4.0 V5.0 JNEM ISM LOGFED WARSIM R&D – DIV (+) CSSTSS IEWTPT Common HW Refresh CBCSE, BCTC Equipment & MCA OPA

  8. JLCCTC Challenge MRF-W MRF-C ERF MRF-W MRF-C m = model i = sim/C2 interface t = tool * Friends of family ACE/ASCCE(m/i) BE Server (m) *Archer(t) Rialto (t) WARSIM (m/i) WIM (m) *IEWTPT (m/i) CBS (m) *BICM (m/i) OneSAF (m/i) JCATS (m) JDLM (or LID) (m/i) JNEM (m) MUSE (m/i) ISM (m) RTM (i) AARS (t) FMT-R (t) ERF EADSIM (m) FIRESIM (m) ETSIU (i) SIMPLE (i) JSPA (t) HDC (t) SASS (t) ExCIS (m/i) TACSIM (m/i) *Friends of the family

  9. JLCCTC MRF-WMulti Resolution Federation (MRF) - WARfighters’ SIMulation (WARSIM) Capabilities Summary • JLCCTC MRF-WARSIM is the US Army’s next generation constructive training simulation that creates a Realistic Training Environment for Commanders and their Staffs. Capabilities includes: • Supporting a DIV WFX/CPX Use Case • C2 Stim with ABCS 6.4 devices including BCS3 and DCGS-A • Three Enclave Solution with Intel capabilities (HUMINT, IMINT, ELINT, COMINT, and MASINT systems) • Interface with AARS, ARCHER, MUSE, JNEM, ISM, and JCATS • Provide Fixed sites capability with BE Services • Improved Diagnosis/Recovery and parametric data management Current Activities Fielding Plan or Schedule • Just completed a very productive MRF-W v5.5 VE and ORE at the NSC and BCTC/BCTP • The MRF-W VE/ORE provided the best operational environment to date to "stress and shake-out" the system to ensure readiness for Army DIV WFXs. • During the VE, the federation availability was 98% with an overall requirements pass rate of an impressive 85% • During the ORE, the System was solid and available 100% the first 60 hrs before encountering the first period of down time; final availability was 91.8% • Conducted four Analysis Events at Fort Huachuca to compare their current simulation systems to WARSIM’s capabilities: • WARSIM interfaced/stimulated DGCS-A v3.0.1 • Verified/updated Intel sensors parametric data/capability • Demonstrated interface with IEWTPT • Upon addressing any outstanding gaps, Fort Huachuca plans to use WARSIM for their school house training exercises • Aug 09: Complete v5.5 MRF-W fielding to the NSC and BCTP • Sep/Oct 09: Field Tech Control Forward suite to Korea in support of the WARPATH II Exercise and 2ID CPX/ORE • 2QFY10 & beyond: Field to additional Army Tier one BCTCs as of 29 May '09

  10. JLCCTC ERF • Capabilities Summary • Full automation of TTP behaviors and simulation objects down to the soldier or vehicle level • Supports exercises from Company to BDE • Models sides/factions BLUFOR, OPFOR, Non-aligned, Neutral and Non-combatants • Trains hundreds of commanders and staff yearly at 22 CONUS and OCONUS sites • DIS / HLA Compliant • Stimulates ABCS 6.4 including Native AFATDS • Software operates on COTS HW • Hardened the integration of LOGFED in FY09. • Current Activities • V5.x Being Fielded at 22 CONUS/OCONUS sites during FY09 • Week 2 of the VE finished on 29 May with the following results: • 182 of 209 tests completed, with 86% tests passed. The remaining tests will be run during the ERF ORE with BCTP in July. • Overall federation availability was 97%. • 74 PTRs were written, of which 43 were closed or deferred. • V5.2 Development (2nd Qtr FY09) FRG ROK Italy • 22 Fielded locations • v5.1 – 2nd Qtr FY09 • v5.2 – 4rd Qtr FY09 • v5.3 – 4th Qtr FY10

  11. OneSAF Overview • Users: • RDECs / Battle Labs / Active Duty Brigades & Battalions • Service / Joint Organizations • International Partners • USG Contractors / Academia • Objectives: • Reduce Army Life Cycle M&S costs • Capable of replacing USA legacy entity based simulations: BBS, OTB / ModSAF, CCTT / AVCATT SAF, Janus (A&T), JCATS MOUT • Programmatics: • MNS: May 97 • PM Charter: May 00 • V1.0 (FOC): Sep 06 • V3.0: Feb 09 • Technical Capability Highlights: • Provides entity modeling to BDE level • Supports both Constructive & Virtual Domains • Provides Urban Operation modeling with COE Focus • Provides DIS/HLA/JC3IEDM/ ABCS Interoperability • Supports ACR, RDA, TEMO) Domain applications Ares Control Interface

  12. DIGITAL INTEGRATION LABORATORY (DIL) System Architecture/DIL Network Diagram • Capabilities Summary • Supports PEO STRI integration of Army System & Non-System training devices with existing and emerging Army Battle Command Systems (ABCS) • Augments & Supports CTSF distributed Army Interoperability Certification (AIC) / testing • Supports PEO STRI Training Development Community by providing ABCS technical expertise and early access to emerging ABCS SW Baselines • PM ConSim • JLCCTC • WARSIM • OneSAF • Current Activities • Undergoing DIACAP for DIL Network Accreditation • Federated Net-Centric Site (FaNS) Accreditation 5 June 2009 • RFP for new competitive effort expected to be posted by mid June Other Agencies • JFCOM/JDIF • RDECOM • NSC DREN PM CATT • SE CORE • AVCATT • CCTT • PM STS PM TRADE AFATDS AMDWS ASAS FAAD FBCB2 GCCS-A MCS BCS DCGS-A • LT2 • DRTS • ETC-IS

  13. Acronyms AAR After Action Review API Application Protocol Interface BC Battle Command CATT Combined Arms Tactical Trainer C2SE Command and Control Simulation Equipment C2 Command and Control CBS CORPS Battle Simulation COE Contemporary Operating Environment CSS Combat Service Support CSSTSS Combat Service Support Training Simulation System CTIA Common Training Instrumentation Architecture DBST Digital Battlestaff Sustainment Trainer DIF Data Interchange Format IEWTPT Intelligence & Electronic Warfare Tactical Proficiency Trainer ISR Intelligence, Surveillance and Reconnaissance JCATS Joint Conflict And Tactical Simulation JDLM Joint Deployment Logistics Model JOE Joint Operations Environment JLCCTC Joint Land Component Constructive Training Capability -MRF Multi-Resolution Federation -ERF Entity Resolution Federation LOD Low Overhead Driver LVC - IA Live, Virtual, Constructive - Integrated Architecture MOUT Military Operations in Urban Terrain OneSAF One Semi-Automated Forces OneTESS One Tactical Engagement Simulation System OIS Future Instrumentation System PoP Proof of Principal SE Core Synthetic Environment Core TACSIM Tactical Simulation TENA Test and Training ENabling Architecture WARSIM Warfighter's Simulation

  14. ConSim Portfolio LVC-IA LIVE CONSTRUCTIVE UBC VIRTUAL

  15. ConSim Portfolio FT Riley BCTC IEWTPT HCC JLCCTC (WARSIM)

  16. LVC IC Build 0

  17. Elements of Live Virtual Constructive Integration of Battle Command: Real world tactical systems used in the training environment. Enabling Technologies: Each of the training domains provide unique complementary capabilities to the entire LVC training environment.

  18. Current State of Modeling and Simulation for Training LIVE VIRTUAL CONSTRUCTIVE

  19. Today’s Reality Enablers Products Future Products LT2 Product Line CTIA FASIT OneTESS Standard CTC OIS MILES Digital Ranges T-IED HITS CTC IS Modification ETC-IS I-MTS OneTESS Live SE Core VSA DVED CM2 CCTT AVCATT Games for Training CDT RCTS JFETS Virtual DIS/HLA Distributed Repository Security Services Common Components C4I Adapter JLCCTC CBS WARSIM OneSAF One Merged Federation & LVC-IA Constructive

  20. MRF-W Plan to Support 2ID WARPATH II Exercise & CPX/ORE 21 as of: For Official Use Only

  21. JLCCTC MRF-C • Capabilities Summary • Models units from section/squad through division • Corps, Division & Unit Employment Operations, • High Fidelity Intel, Logistics & AAR Federates • Linkage to Battle Command & Control Systems • Trains commanders and staff • Only US Ground model that is KSIMS compatible • Key Events: Unified Endeavor, Ulchi-Freedom Guardian , Key Resolve, Yama Sakura, WarPath, Cobra, Rapid Thunder, Iron Focus. • Security Classification : Unclassified to TS/SCI • Current Activities • Fielded v4.1 to NSC, BCTP, Hood, Bragg, Lewis, KBSC, and JMTC in FY 08. • Fielded V5.1 to Ft. Hood Jan 09 • V5.2 FINAL PLANNED VERSION • VE June 22nd – July 2nd • FY2010 CBS in Full Sustainment JMTC FRG KBSC

  22. FT Lewis Schofield FT Bragg FT Huachuca FT Hood IEWTPT – TCC/HCC • Capabilities Summary • Supports Intelligence Surveillance & Reconnaissance • Operates in the Constructive & Live Domains • Supports the Intel Warfighter and Commander • Trains Intel Warfighter in their “Go-to-War” system • Forces cross domain fusion within intel BOS • Robust AAR Generation • Hardware/Software and contractor support at sites • Utilizes Service Based Architecture for large entity counts as well as aligning with Army ISR systems (DCGS-A, ACS) • 3-D environment to support realistic tactical questioning techniques and procedures • 19 scenarios currently fielded – 3 MP; 16 HUMINT • Current Activities • Developing Signals environment in the TCC to stimulate SIGINT ISR platforms • V4.0 Development (2nd Qtr FY10) • Integrating technology into HCC • Building new scenarios for the HCC • 7 scenarios (5 HUMINT, 2 MPs) currently being developed; 5 additional HUMINT scenarios planned • Integrating Quick Reaction Capabilities into TCC • Supporting Army G2 initiative in developing a training solution for DCGS-A • Working with Army Evaluation Center to use IEWTPT for DCGS-A testing and evaluation • Successfully supported Austere Challenge 09 Current Fielded Sites

  23. OneSAF GE • Capabilities Summary • CGF/SAF modeling from entity to BDE • Supports Constructive & Virtual Domains • COE Focus with Urban Operation modeling • Operations from Scenario Generation thru AAR • DIS / HLA / JC3IEDM / ABCS Interoperability • Supports ACR, RDA, TEMO Domain Events • Software only • Platform independent (Linux/Windows) software Paving The Way To The Future Common APIs, DIFs, & Protocols DIS, HLA Common Components C4I Adapter, SNE, AAR, Scenario Generation Common Architectures CTIA, VSA, OneSAF CTCs, Staff & Virtual Trainers Interoperable Applications • Current Activities • TEMO Domain assessment @ NSC (July) • OmniFusion (OF) 09 @ Maneuver Battle Lab (July) • FCS Events @ Ft. Bliss (July) • V3.0 International Development (3rd & 4th Qtr FY09) • V4.0 Development (Planned delivery: 2nd Qtr FY10) • V5.0 Development (Planned delivery: 2nd Qtr FY11) • Merged software development baseline with SE Core • FLOIS TALON STRIKE (TS) using OneSAF for collaborative US & UK Battle Command stimulation (FY10) • Over 200 Hundred Domestic • Locations & 7 International Partners • v3.0 – Released 2nd Qtr FY09 • v3.5 – 4th Qtr FY09 (Planned)

  24. Ft. Riley Ft. Leonard Wood FY09 Fielding FY10 Fielding FY11 Fielding Ft. Campbell Ft. Benning WSMR Ft. Bliss Ft. Sam Houston Battle Command Training Capability – Equipment Support (BCTC-ES) Admin Support Staff • Capabilities Summary • Furniture, Fixtures, and Equipment • Battlefield Visualization System • Radio-Wire Integration System • Network Infrastructure Upgrade and Simulation System connectivity • Battle Command (C2) Server Fielding / Refresh • Simulation-to-C2 end-to-end Connectivity and Integration • Packet Radio Units and Antenna Systems (Fixed / Mobile) Expandable Classrooms AAR Reconfigurable Tactical Operations Centers (RTOC) Expandable Tech Control Comms Workcells Fielding Plan or Schedule • Current Activities • Fielding Ft. Riley BCTC (med) (estimated completion – 8 Jun) • Working with the Ft. Benning (Harmony Church) team for a 100% Design for the new facility • Preparing contract actions for the Ft. Campbell & Ft. Bliss Medium BCTC Fielding • Scheduling Red Zone Meeting to complete plans on fielding for the FY10 BCTC Fielding’s

  25. FITE JCTD • Capabilities Solution: • Three Configurations: • Spiral 1: Individual-worn Virtual Reality • Spiral 2: Facility-based Mixed Reality • Spiral 2: Individual-worn Augmented Reality • Configuration Components: • Software virtual environment • Commercial hardware • Visual, auditory, touch, and smell components • Position and weapons tracking system • AAR system • Funded by OSD/AS&C, JIEDDO, and JFCOM • Transition: • Extended Use of Interim Capability, Targeted Locations: • Camp Lejeune and Fort Benning • If conducted, resourced through BA4 funding • Follow-on Development, Production, Fielding, and Sustainment, Targeted POR/Programs: • Dismounted Soldier (PM CATT) • CACTF (PM TRADE) • IIT (PM TRASYS) • Mission Rehearsal (USSOCOM) • SITE [proposed TBD (PM TRASYS)] • Participants: • User Sponsor: JFCOM • Operational Manager: JFCOM • Technical Manager: ONR • Transition Manager: PEO STRI • Oversight Executive: ODUSD (AS&C) • Schedule: • Technical Demonstrations: May 09, Apr 10 • Operational Demonstrations: Aug 09, Jul 10 • Operational Utility Assessments Reports: Oct 09, Sep 10

  26. Interoperability of Current and Future Systems C4I M&S Domain M&S C4I Domain Shared Solutions Processes Reusable Components Common Standards Common Data Architectures Army Staff Material Developers Combat Developers Cross Domain SIMCI Management SIMCI Simulation-to-C4 Interoperability • Description • Mission: Provide policy, organizational, process, and technical recommendations to Army Leadership to improve interoperability of M&S and C4I systems • Focused on common components, data, standards, architectures, and processes • Co-chaired by PEO STRI & PEO C3T; originally chartered in FY2000 Migration SIMCI OIPT Membership • FY09/10 Focus Areas • Mitigating the impact of Capability Set 11-12 on M&S systems • Initialization • JC3IEDM Migration

More Related