1 / 5

I-95/Pioneer Trail Interchange

I-95/Pioneer Trail Interchange. County & Port Orange request restoring interchange to TPO “unfunded” LRTP To allow interchange to be evaluated for need & impacts. son Blvd. Williamson Blvd Extension (Funded for Construction ). S William. ETDM Environmental Screening.

Download Presentation

I-95/Pioneer Trail Interchange

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. I-95/Pioneer Trail Interchange County & Port Orange request restoring interchange to TPO “unfunded” LRTP To allow interchange to be evaluated for need & impacts son Blvd Williamson Blvd Extension (Funded for Construction) S William ETDM Environmental Screening New Interchange Location PD&E LRTP Turnbull Bay Rd IJR Pioneer Trail

  2. I-95/Pioneer Trail Interchange • Historical Summary • Williamson Blvd previously crossed • I-95 with interchange • 2010 LRTP (VCATS) Highway Needs Plan (Mar ‘83) • 2015 LRTP MPO Transportation Study (Nov ‘94) • 2020 LRTP MPO Transportation Plan (May ‘96) • Williamson Blvd alignment revised to stay west with interchange at Pioneer Trail • 2025 LRTP MPO Transportation Plan (Nov ‘05) Previously Proposed Williamson Blvd Extension w/ I-95 Interchange son Blvd S William Turnbull Bay Rd Pioneer Trail New Interchange Location

  3. I-95/Pioneer Trail Interchange • Historical Summary (Continued) • FDOT Studies: • I-95 Systems Operational Analysis Report - SOAR (Nov ‘05) - Pioneer Trail interchange meets minimum spacing requirements • I-95 Sketch Interstate Plan - SIP (Mar 2010) – Pioneer Trail interchange included as “new” designated future roadway project • Interchange at I-95/Pioneer Trail not included in LRTP: • 2035 MPO Transportation Plan (Sept ‘10) son Blvd S Williamson Blvd Extension (Funded for Construction) S William Turnbull Bay Rd Pioneer Trail New Interchange Location

  4. I-95/Pioneer Trail Interchange • Port Orange Comprehensive Plan Historical Summary • Initially included in the 1998 Comprehensive Plan Transportation Element – Planned Capital Improvements • Retained in the 2010 Comprehensive Plan update

  5. I-95/Pioneer Trail Interchange Recommendation: Restore interchange to TPO “unfunded” LRTP allowing it to be evaluated for need & impacts son Blvd Williamson Blvd Extension (Funded for Construction) S William ETDM Environmental Screening New Interchange Location PD&E LRTP Turnbull Bay Rd IJR Pioneer Trail

More Related