140 likes | 395 Views
Announcements. November 6 th Exam November 13 th Tom Rossby Seminar Early Dec– Class Project. Exam 1 problem 2 answer key is posted on the course website? I promised them that I'll have it by today. Here is the direct link : http://marine.rutgers.edu/dmcs/ms451/2006/exam/
E N D
Announcements November 6th Exam November 13th Tom Rossby Seminar Early Dec– Class Project. Exam 1 problem 2 answer key is posted on the course website? I promised them that I'll have it by today. Here is the direct link : http://marine.rutgers.edu/dmcs/ms451/2006/exam/ Thanks. Donglai
H=5m Solution to these time Dependent equations for a constant wind stress for three different depths H=20m H=100m
H=100 meter H=100 meter Wind turns off after 1 inertial period
H=10 meter Wind turns off after 1 inertial period
x z r1 r2 Baroclinic (Depth Dependent) Pressure Gradient
Along Channel salt/dye sections May 4th May 6th May 7th Dye Conc 10-11 May 8th km north of the Battery
2-D Random Walk with Advection 2-D Random walk