An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Jai Hind Cycle Inc. Presented By: Mike Seide Sean McCauley Matt Zbylut Rebecca Gramse

  2. Introduction • Jai Hind Cycles produces bicycles and is planning on introducing a new model of mountain bike strictly for the export market • The company currently runs one shift per day and is considering replacing their existing factory layout with a cellular, group technology layout

  3. Assumptions • Production at 82,000 units would be interpreted as 328 bikes per production day • Of those 328 bikes, 200 would be regular bikes and 128 would be mountain bikes • 250 work days/year; 2080 work hours/year; 8 hour work days • Anything not produced is sub-contracted or purchased from the market for the final assembly • A 100 hour warm-up period was used to reach steady state

  4. As-Is Model • Job shop facility layout • Current Production of 200 regular bikes per day • High quantity of casting and final assembly machines • Inefficient workspace

  5. Building the As-Is Model

  6. To-Be Model Assumptions • AGVS speed is set to a maximum of 5 mph • Human workers will transport the goods between stations • Human worker speed empty is 300 fpm and full is 250 fpm • The operators and AGVS will return home when idle • Production runs two 8 hour shifts per day • AGVSs are used to transport raw materials from Raw Material Receiving/Storage to the designated queues. • Each cell contains 1 machine of each type

  7. To-Be Model • Incorporated Group Technology with Cellular Manufacturing • Part Families, like characteristics • AGVS • Delivering raw materials to cells • Workers • Path network, constantly moving to different cells for assistance or assembly

  8. Building the To-Be Model

  9. FMS Used in Model • Cellular Manufacturing Layout • Use of simple machines, no custom jigs • Use of AGVS for transportation • Cross Trained Workforce

  10. To-Be Model Results • Bottlenecks • Frame cell and Handle Bar cell was over utilized • Reduced by adding cells to both • Production increased to 333 bikes per day • Reduced labor by adding AGVS delivery system of raw materials • Reduced # of workers by incorporating floating worker design

  11. Recommendations • Implement the Group Technology Cellular Manufacturing layout • Add capacity to the frame and handle bar cells • Use AGVS to reduce workers and increase efficiency • Use workers to transport materials between cells