Asphalt Roadway. Daily Report of Quality Control (Form No. 675-030-20). A step by step guide. This is calculated from the Gmm on the Mix Design. It is Gmm times 43.3 times thickness of the lift. Automatic Calculation. Automatic Calculation. Automatic Calc. If within tolerance, # is Blue,
E N D
Asphalt Roadway Daily Report of Quality Control (Form No. 675-030-20) A step by step guide
This is calculated from the Gmm on the Mix Design. It is Gmm times 43.3 times thickness of the lift.
Automatic Calculation
Automatic Calc. If within tolerance, # is Blue, if not # is Red
If spread is within the allowable tolerance, # is Blue, if not # is Red. If out tell Foreman and document it in the Remarks at the bottom of the page.
These daily totals go here Automatic calculation
Input the waste from the days production Automatic calculation
These Tonnages Are Totals for This Pay Item
Density Required Previous Tonnage: Today’s Tonnage: Total Density Required:
No Density Required Previous Tonnage: Today’s Tonnage: No Density Required Total Tonnage:
These 2 numbers must equal this one: These 3 numbers must equal this one:
Avg. of all temperatures, Max. temp of the day, Min. temp. of the day & Avg. temp of the 1st 5 loads.
Enter pay item for tack. If tack is included in the price of the asphalt, enter the pay item for the type of asphalt being placed. Prime calculations can be entered here if prime is being used
Enter the distributor number (FDOT calibration number) that is being used to place the tack. (From previous slide)
Look up beginning depth reading and the corresponding gallon reading
Enter the beginning measurement and the corresponding gallons from the tack chart. REMEMBER: NO CHART~NO START
Look up ending depth reading and the corresponding gallon reading
Enter the ending measurement and the corresponding gallons from the tack chart after tack is shot. This is an automatic calculation. (Beginning gallons minus ending gallons.)
Enter the time you finished shooting the tack and the temperature of the tack from the distributor.
Look up temp. on chart and select corresponding Correction Factor.
Enter the correction factor for the temperature of the tack.