ScotGRID:The Scottish LHC Computing Centre

Summary of the ScotGRID Project. Phase2 of the ScotGRID Project. Phase1 of the ScotGRID Project. Introduction: ScotGRID Goals. ScotGRID:The Scottish LHC Computing Centre. 2000: JREI Bid. The LHC Computing Challenge for Scotland. ScotGRID: The Spirit of the Project.

shalom
Download Presentation

ScotGRID:The Scottish LHC Computing Centre

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase1 of the ScotGRID Project Introduction: ScotGRID Goals ScotGRID:The Scottish LHC Computing Centre

  2. 2000: JREI Bid The LHC Computing Challenge for Scotland ScotGRID: The Spirit of the Project The JREI funds will make possible to commission and fully exercise a prototype LHC computing centre in Scotland The Centre would provide: Technical service based for the grid services DataStore to handle samples of data Analysis Significant simulation production capability Excellent network connection RAL / Regional sites Support grid middle devel. with CERN/RAL Support core software devel. within LHCb/ATLAS Support user applications in other scientific areas • This will enable us to answer: • Grid viable solution for LHC computing challenge,TDR • Can a two-site Tier-2 centre be setup and operate effectively • How can network topology between Ed,GL, RAL & CERN http://www.scotgrid.ac.uk/

  3. Time-Line for a Production Tier-2 & beyond Completed: Phase1 Phase2 Links to other applications… Future Upgrades ? Production Tier-2 Site Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 2003 2004 2005 2001 2002 Start of GridPP-II Prototype To Production End of JREI funding Start of ScotGRID-II Delivery of more Kit…

  4. ScotGRID Processing nodes at Glasgow • 59 IBM X Series 330 dual 1 GHz Pentium III with 2GB memory • 2 IBM X Series 340 dual 1 GHz Pentium III with 2GB memory • 3 IBM X Series 340 dual 1 GHz Pentium III with 2GB memory • 1TB disk • LTO/Ultrium Tape Library • Cisco ethernet switches ScotGRID Storage at Edinburgh • IBM X Series 370 PIII Xeon • 70 x 73.4 GB IBM FC Hot-Swap HDD Hardware Middleware Applications

  5. Documentation Accumulated CPU Use http://www.scotgrid.ac.uk/ Instantaneous CPU Use Tier-2 Web-Based Monitoring Total Disk Use ScotGrid reached ~ 580,000th processing hour

  6. ScotGrid accumulated stats Significant non-LHC application use Q3 Q1 Q2

  7. ScotGrid JREI project includes a mid-term hardware upgrade. • As part of GridPP planning, we need to upgrade from Prototype to Production Tier 2 status by 2004. • JREI funding left to be spent by June 2003: • Edinburgh £220k • Glasgow £30k £250k ScotGRID Phase-2 : Just Started

  8. Summary of ScotGRID Upgrade Upgrade Database Server in Edinburgh xSerier 440 (8 Way 1.9GHz Intel Xeon, 1MB L3 Cache, 32GB Memory, 36GB Internal Disk) 16 – 20 TB of Disk Storage in Edinburgh FAStT700 or FAStT900 (see next slide) • 5 TB of Disk Storage in Glasgow • Agreed to relocate existing FAStT500 from Edinburgh to Glasgow Edge Servers for Edinburgh EDG SE:1 from Glasgow (x340) LCFG, CE: 2* x205, 1 x 1.8 GHz, 256MB, 40GB New Kit for Glasgow CDF & eDIRT Kit

  9. Storage System 20TB vs. 18TB

  10. IBM@server: xSeries 440 8* Xeon (1.9GHz) 32 GB, Scalable configuration Dual FastT900 + 24 TB ScotGRID-Edinburgh: Schematic x205 P4/1.8 GHz /256 MB RH7.3 x340 dual PIII/1 GHz /2 Gbyte RH7.3 CE LCFG Storage Nodes x205 P4/1.8 GHz /256 MB RH7.3 Gbps Fibre connection

  11. The CDF kit has • 1 rack with only UPS • 1 rack with • 10 Dell dual Xeon 2.4 • GHz 4GB, • 7.5 TB disk, UPS • 1 rack with • IBM x370 8 of 700 MHz • Pentium III with 8GB, • 1 TB via FAStT500, UPS • 1 tape library ScotGRID-Glasgow: CDF Kit IBM: http://www.xcat.org/ CDF: http://www.scali.com/

  12. The eDIKT kit has: http://www.edikt.org/ • 4th rack on the right and has • 6 IBM x335 (1U high) dual Xeon 2.4 GHz • and 1.5 GB memory • 2 IBM BladeCentres (7U high) each with • 14 Blades x335 dual Xeon 2.4 GHz and • 1.5 GB memory ScotGRID-Glasgow: eDIKT Kit

  13. GIIS control connection Virtual GIIS data connection Org. Catalog Storage Globus Element Replica (GridFTP) Catalog Tier2 GateWay (Broker) Cluster Worker Globus gatekeeper A nodes EDG Job Grid + job manager u Manager t GridFTP h Front-end PBS GIIS Globus GRIS GIIS Working Directories Information Providers: /session1 queues, jobs, users /session2 Cluster ... Cluster Possible ScotGRID Config

  14. Summary of Tier-2 ScotGRID Project • Have Successfully completed Phase-1 • ScotGRID had been upgraded – Phase-2 • eDIRT Kit, CDF Kit • HPS + Larger DataStore • ScotGRID: will concentrate on commissioning the new hardware during the next few month. before going to EDG2.0 • There will be an ad. for ScotGRID Technical Coordinator • We will have to start to think about restructing the ScotGRID team for production running – early next year • In the New Year plan to integrate the Durham CPU Farm

  15. BackUp Slides

  16. ScotGRID-Glasgow: Schematic x340 dual PIII/1 GHz/0.5 Gbyte x340 dual PIII/1 GHz /2 Gbyte x340 dual PIII/1 GHz /2 Gbyte Masternode Storage Nodes Head Nodes Campus Backbone Internet VLAN 10.0.0.0 VLAN 100 Mbps 1000 Mbps Compute Nodes 59 x330 dual PIII 1GHz/2 Gbyte

  17. Disk Arrays(Total 4.6 Tb) SRIF Network FastT 500 Storage Controller Server (4*Pentium Xeon, 16Gb RAM) ScotGRID-Edinburgh: Schematic