Innovative Sub-sea Solutions. Cybernetix Expertise and Projects. Deepwater Intervention. Deepwater Intervention. Projects in the field of Deepwater Intervention. Crawlers. AUVs. ROVs. Inspection and Maintenance. Inspection and Maintenance.
E N D
Deepwater Intervention Projects in the field of Deepwater Intervention Crawlers AUVs ROVs
Inspection and Maintenance Projects in the field of Inspection and Maintenance OCTOPUS (for inspection) ICARE ROTIS II
Girasol Project Monitoring Projects in the field of Monitoring Modular SensorClamp Charles De GauleProtection Net
Work Package 8 Deployment and Operational Procedures
Work Package 8: Content Work Package 8 in one line: “The Scope of WP8 is to define the required procedures for the deployment, operation and recovery of the DIFIS system.” • Work Package 8 Objectives: • A detailed guideline for deployment and recovery procedure • A detailed guideline for offloading procedure • A detailed guideline for management and maintenance procedure.
Work Package 8: Content Work Package 8 in the Workflow: WP3Technology State of the Art WP2Operational Requirements WP4Functional Specifications WP5Early Design WP6Concept Verification and Optimization WP7Detailed Design WP8Deployment and Operational Proc. WP9Planning and Costs WP10Exploitation and Dissemination
Work Package 8: Deliverables • D 8.1 Report on deployment and recovery procedure • Pre-installation phase: • Means of surveying the site (surface and sub sea survey). • Installation phase: • Installation of suction anchors • Installation of the oil removal system’s components • ROV interfaces • Conception and simulation of a supervisor for robotic functions • Monitoring of the operation • Fixation of ensemble • Validated scenario of robotic installation Delivery Date: Month 27
Work Package 8: Deliverables • D 8.2 Report on offloading procedure • Definition of offloading procedure • Docking system to the tanker (definition) • Positioning of shuttle tanker Connections between tanker and offloading system Offloading process. Delivery Date: Month 27 • D 8.3 Report on management and maintenance procedures • Definition of procedures using conventional ROV standards and tools • Definition of visual inspection means • Frequency of inspections (elaborated with input from WP7) Delivery Date: Month 27
Work Package 8: Partners CYX (5)10 MM MARIN (1) 1 MM IFR (3)5 MM CEA (4)3 MM ISI (7)1 MM • Approach • Clear distribution of WP internal tasks inside (vs phases & expertise). • WP internal planning. • Deliverable structure <= WP KickOff
Autonomous ALIVE Underwater Vehicles Back
Autonomous SWIMMER Underwater Vehicles Back
Robotics ICARE For Certification Back