90 likes | 358 Views
FYP PRESENTATION 2 WORK OF PROGRESS (From Sept2003 to Dec2003). 9thDec2003. 1. Research Continuously 2. The work on the storyline 3. Location Scout 4. Casting. 1. Research Continuously. Films related Novel related Comic related http://sweb.cityu.edu.hk/50322642/FYPsite/FYPmain.htm.
E N D
FYP PRESENTATION 2WORK OF PROGRESS(From Sept2003 to Dec2003) 9thDec2003
1. Research Continuously • 2. The work on the storyline • 3. Location Scout • 4. Casting
1. Research Continuously • Films related • Novel related • Comic related http://sweb.cityu.edu.hk/50322642/FYPsite/FYPmain.htm
2 The work on the storyline • The Scene Break Down • a.First version done on 28/10/03 b. Meeting 2 times with each advisors to discuss about the story
focus on: • i.The storyline • ii.The characterization • iii.The visual treatment • iv.If it is possible to shoot on the location • v.If it is possible to shoot on time in 6 production days
a.Finalize on 17/11/03 --There are 24 scenes version
3. Location Scout • Graveyard on September • Secondary School on October C. Public Estate on November
4. Casting • Vivian • Rat C. Chicken
5. The Work of the website • http://sweb.cityu.edu.hk/50322642/FYPsite/FYPmain.htm