An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. West Dock Pier ConnectorJuly 12th 2010 Fire Seaport Advisory Council Application October 7, 2010

  2. Menemsha HarborMartha’s Vineyard Island

  3. West Dock & Boathouse

  4. Menemsha Harbor - West Dock

  5. Phase I 300 ‘ Concrete floating dock 150 ‘ Wooden pedestrian walkway 2 Ramps and platform Phase II 500 ‘ Pier Connector 500 ‘ Wave Wall Utilities Phase III 100 ‘ Transient floating docks

  6. Finances • Phase 1. $295,200 • Phase 2. $ 1,421,000.00 • Removal of the old access way $ 100,000.00 • 64- 50’ long Concrete filled 12” dia. $ 400,000.00 • 32- Precast Concrete Pile Caps $ 64,000.00 • Concrete Slabs $ 265,000.00 • Cast in Place Concrete Slabs $ 27,000.00 • Cap logs and railings $ 170,000.00 • Water and Electric $ 100,000.00 • Cast in place concrete $ 25,000.00 • Composite sheeting $ 270,000.00 • Phase 3. $155,000 • 100 feet of Transient floating concrete dock, fender piles • Survey, Design, Engineering, and Permitting $ 182,000.00 • Other Costs Construction Oversight $212,500.00 • TOTAL $2,265,700

  7. Thank you. Chilmark Board of Selectmen Warren Doty Frank Fenner Jonathan Mayhew