ENABLING NETWORK FOR CAPITAL REPAIR OF BF 5

ENABLING NETWORK FOR CAPITAL REPAIR OF BF 5. PRESENTED BY B K BECK STAFF NO –353532 CAPITAL REPAIR ELECTRICAL. POWER SOURCE AT BF 5 THE MAIN SOURCE IS 5PTI SUBSTATION CUBICAL – 105 - CHARGING SIDE CUBICAL – 311 - GSP – CH 9 SIDE CUBICAL – 203 - GSP - CH 10 SIDE

shandi
Download Presentation

ENABLING NETWORK FOR CAPITAL REPAIR OF BF 5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENABLING NETWORK FOR CAPITAL REPAIR OF BF 5

  2. PRESENTED BY B K BECKSTAFF NO –353532CAPITAL REPAIR ELECTRICAL

  3. POWER SOURCE AT BF 5 THE MAIN SOURCE IS 5PTI SUBSTATION • CUBICAL – 105 - CHARGING SIDE • CUBICAL – 311 - GSP – CH 9 SIDE • CUBICAL – 203 - GSP - CH 10 SIDE • CUBICAL – 309 - SCRAPPER WINCH AND 10 T WINCH

  4. MAIN POWER FLOW DIAGRAM • DNW CUBICAL CRE BREAKERS KEPT AT 5PTI VARIOUS JUNCTION BOXES AT VARIOUS LEVELS IN FURNACE

  5. CHARGING SIDE CRE BREAKER JN BOX AT CH 10 SIDE JN BOX AT CH 10 SIDE JN BOX AT CH 9 SIDE PDB AT CH 9 SIDE PDB AT CH 10 SIDE PIT AREA ICTPN 63 A SECOND LEVEL MINI PDB AT MINUS LEVEL 24 V TRANSFORMER

  6. CAST HOUSE LEVEL 5PTI PPTI PPTI PPTI SINTERING PLANT SIDE SS WINCH MS WINCH SCRAPPER MPT MPT COOLER TROLLEY SCRAPPER FURNACE WINCH ICTPN PPTI

  7. SCRAPPER WINCH SOURCE JN BOX 200 AMPS SWITCH STARTER SCRAPPER WINCH

  8. GAS SAMPLING PLATFORM 5PTI JUNCTION BOX JUNCTION BOX C HOIST TELPHER PLATFORM MS WINCH PDB PDB PDB PDB FURNACE MPT MPT MPT = MULTI POINT TRANSFORMER C HOIST = CENTRAL HOIST MS WINCH= MULTI SPEED WINCH

  9. SEVeNTH PLATFORM PPTI PPTI SS WINCH SS WINCH CENTRAL HOIST FURNACE MINI PDB SINGLE SPEED WINCH ICTPN NEAR LIFT Y JN LIGHT

  10. FRONT OF FURNACE STOVE CONTROL ROOM PPTI FURNACE ICTPN DUST CATCHER AREA CRE CONTROL POST MINI PDB 10 T WINCH

  11. DRIVES MAINTAINEDBY CRE • 1. BRICK ELEVATOR 1 no • 2. BUCKET ELEVATOR 1 no • 3. BRICK CONVEYOR 8 no • 4. SS WINCHS 5 no • 5. MS WINCHES 5 no • 6. CENTRAL HOISTS 2 no • 7. 10 T WINCH 1 no • 8. 24 V TRANSFORMERS 20 nos • 9. SCRAPPER WINCHES 2 no • 10. MULTI POINT TRANSFORMERS 4 nos