1 / 31

Fiber To the Antenna

Fiber To the Antenna. Market Opportunity and Solutions Overview November 7 th , 2011. Agenda. Market Drivers Deployment Scenarios JDSU solutions. Market Drivers. What Is Driving Network Growth?. Content, Applications, & Intelligent Devices. Killer Applications. Network Traffic Growth.

shania
Download Presentation

Fiber To the Antenna

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fiber To the Antenna Market Opportunity and Solutions Overview November 7th, 2011

  2. Agenda • Market Drivers • Deployment Scenarios • JDSU solutions

  3. Market Drivers

  4. What Is Driving Network Growth? Content, Applications, & Intelligent Devices Killer Applications Network Traffic Growth Infrastructure Modernization • High definition, media rich content • Interactive mobile applications • More mobile base stations • Low latency backhaul • Mobile penetration: 100% by 2015 • SmartPhones: 75% by 2015 Fiber Networks are Proliferating to Support Backhaul Needs

  5. Mobile Networks are Strained • More Cells Required • For example: a 700 MHz LTE network with 10 MHz, will deliver sector throughput of 15 Mbps. • In the US alone there are on average 1000 subscribers cell site, or 333 subscribers per sector. • Each subscriber will be sharing 15 Mbps! Average Subscribers per Cell Site (US) • Too many users are simultaneously using the same capacity. • LTE/4G build out requires an order of magnitude more cell sites. • . More cell sites and Antennas Reduces the Number of Subscribers Per Cell

  6. Mobile Network Coverage Still Has Many Gaps AT&T Coverage – Palo Alto, October 2010

  7. Multiple Radio Strategies Required • Lower cell site densities mitigate radio spectrum efficiencies. • Increased number of antennas, sectors. • Fewer subscribers per sector. • Smaller sector sizes. • Improve coverage & Capacities Macrocell Coverage Microcell Coverage Macrocells, Microcells, Picocells, Femtocells

  8. Massive Antenna Expansion Required for 3G and 4G • An Order of Magnitude Increase Needed • Increase capacity & coverage • Reduce number of subscribers per sector • Fill in coverage gaps • Macrocell expansion alone is not practical • Costly • Energy hungry • Unsightly: Not In My Backyard New Radio Access Strategies are Required

  9. Enter Next Generation Compact Radio Heads:Enabling Distributed Base Stations • Disruptive Radio Access Networks • Centralized Baseband Units • Virtualized Radio Networks • Reduced Cost & Complexity • Fiber to the Antenna Evolution • Significant new backhaul market opportunity • Hundreds of Thousands of Remote Radio Heads predicted Source: Alcatel-Lucent Number of Remote Radio Heads Set to Explode Source: JDSU Internal Analysis, ABI Research, Mobile Experts Distributed Requires: Low Latency, Multiprotocol, Reliable Connectivity

  10. Deployment Scenarios

  11. Rapidly Evolving Radio Access Networks Radio Head Macrocell IP/Ethernet Mobile Backhaul Baseband Unit Mobile Switching Center Mix of backhaul methods: Copper, Microwave, Fiber Microcell Picocell Compact Base Stations Base Station RF over Fiber “Fronthaul” Distributed Baseband Unit Compact Radio Heads

  12. Traditional Mobile Base Station Deployment • A mobile Base Station consists of two functional elements • REC: Radio Equipment Controller; aka the BBU: Base Band Unit. • RE: Radio Equipment; aka the RRU: Radio Remote Unit or RRH: Remote Radio Head • Traditional base station deployment had RRH and BBU co-located • Large equipment footprint, high power consumption and high deployment costs. • Coaxial cable connected the base station to the antennas at the top of the tower. • 2G networks: The base station is called the BTS, • 3G networks: The base station is called NodeB. • 4G networks : The base station is called eNodeB. Lower Cost, Simpler Deployment Options Were Needed

  13. The Base Station Evolution • Physical separation of the BBU and RRU • Allows the RRH to be located next to the antennas in Remote Radio Head End (RRH) enclosures. • Allows BBU to be optimized for size, power and more conveniently located. • The Start of Fiber to the Antenna • Fiber replaces coax • Lower loss, better performance. • Easier to install FTTA 1.0: Fiber Up the Tower

  14. Remote Radio Head / FTTantenna This is what they’re doing with the fiber 100m in the air Enclosure RRU Jumper Fiber to the Antenna, 100m up Antenna Trunk 12 or 24 fibers up 2 fibers / RRH = 6 fibers used Fully connected FTTA This is a very different environment for construction and maintenance Bring a hard-hat and some cigarettes Where is your fiber backhaul?? Then they jumper to the RRH

  15. LightRadio Creates Unique Realities • A lot more fiber deployed. • More points of failure. • More protocols to test. • More points to monitor. • More connections to terminate. • Aerial and microtenched fiber. • Analog and Digital RF (e.g. CPRI). • New backhaul service revenue. Installation, Troubleshooting, and Service Assurance Solutions Required

  16. JDSU Solution Overview

  17. JDSU Solutions for Macrocell & Fiber BH MTS-6000 supporting Ethernet Testing HP2-60 Inspection ScopePower/Loss Meter Mobile Switching Center ONMSi OLP-35 SmartPocket™ Power Meter OTU-8000 Backhaul monitoring MTS-5800 Supporting Ethernet Testing T-BERD/MTS-2000 Measurement Platform SM, Quad OTDR, Inspection, PM, IL, ORL, VFL OCC-5x Optical Channel Test w/ xWDM Apps FFL-050 Pocket VFL End-to-End Solution Covering all Deployment Phases

  18. JDSU FTTA Solutions for Macrocells Copper Cable Fiber Enclosure Fiber Jumpers (3x 2f) Fiber Trunk (24f)

  19. Typical FTTA OTDR Trace and Table 5 6 2 3 4 A

  20. JDSU FTTA Solutions for Macrocells Copper Cable Fiber Enclosure Fiber Jumpers (3x 2f) Fiber Trunk (24f)

  21. ONMS Benefits - Backhaul • Improve network availability • Quickly detect and locate faults and degradations • Improve SLA management • Generates reports to support SLA agreements (MTTR, Statistics on alarms..) • Enhance maintenance team efficiency • Remote Measurement • Intelligent Dispatch • Increase Network Security • fiber tapping OTU-8000 Backhaul monitoring

  22. JDSU FTTA Solutions for Distributed Base Stations JDSU FTTA Portfolio Inspection/Test OTDR/Loss MTS6000 Continuous Fiber Monitoring Probe End-to-End Solution Covering all Deployment Phases

  23. Fiber Installation & Testing:Fiber Field Test Solutions Testing the “Fronthaul”: RF over FIBER Backhaul between Radio Head and Baseband Unit T-BERD/MTS-2000 Measurement Platform SM, Quad OTDR, Inspection, PM, IL, ORL, VFL HP2-60 Inspection ScopePower/Loss Meter OCC-5x Optical Channel Test w/ xWDM Apps OLP-35 SmartPocket™ Power Meter Inspect and clean optical connectors. 1 FFL-050 Pocket VFL Verify Power Levels 2 Perform end-to-end Loss, Return Loss and OTDR test to verify fiber continuity and link parameters. 3

  24. Testing & TroubleShooting:Protocol Simulation and Pre-Qualification Qualifying the “Fronthaul”: Validating the fiber network support for Radio over Fiber protocols. MTS-5800 Layer 1 - 2.4G and 3.1G CPRI MTS6000 supporting CPRI Protocol Testing Qualify fiber links by running Bit Error Rate tests. 1 Validate end-to-end Digital RF protocol and data rate support. 2 Perform end-to-end Loss, Return Loss and OTDR test to verify fiber continuity and link parameters. 3

  25. FTTA Service Assurance:Continuous Fiber Monitoring Probe Monitoring the “Fronthaul”: Fault Isolation and Proactive Monitoring of signal Degradation Remote Fiber Probe Reflector Unit CentralizedContinuous Fiber Test Unit Constantly loopback test tone at Remote Radio Heads to ensure continuity. 1 Set thresholds for predictive analysis of fiber ageing. 2 Detect fiber faults, instantly notify, sectionalize between radio network and fronthaul. 3

  26. FTTA Service Assurance:Reduce FTTA Service Downtime and Costs • Cost Effective • Monitor Transmit and Receive Fibers. • Monitor Any Network • Detect anomalies instantly: reduce detection time by 50%. • Preserve revenues by 50%. • Reduce SLA penalties by 75%. • Deploy Anywhere: • Hardened, unpowered, Remote Reflector Unit. • Precise: • 0.1 dB optical power level monitoring resolution. • Predictive analysis of fiber performance degradation. • Reduce time to restore due to fiber cut or tampering. • Isolate failures between mobile operator and backhaul provider. • Proactively Monitor reliability of leased fiber. Reduce Costs, Improve User Experience

  27. WaveReady Distributed Antenna Backhaul Solution Hub Central Office: Wireless Provider Co-Location, Base Station Hotel DAS Backhaul Demarcation Intermediate Central Office: Signal Regeneration Fiber Assurance Probe • Continuous Fiber Monitoring • Deployable anywhere DAS Backhaul Termination DAS Signal Regeneration • Reliable • Proven • Cost Effective • Low Latency • Native Protocols Signal Regenerators • Extend Digital RF signals • Conserve backhaul fiber Improving Mobile Coverage, Reducing Radio Access Network Costs

  28. Mobile Demands Fuels Fiber to the Antenna • Fiber is expanding wider and deeper into the networks • Connectivity brings advantages and considerations • When the right tools are present we can prevent problems before they occur • Effective Testing of physical layer lowers maintenance costs • Assurance of the fiber minimizes customer issues. JDSU Offers a Unique, End-to-End FTTA Solution TODAY

  29. Who is the Customer? • Wholesale • Level3 • Cable • Comcast • Virgin Media • ILEC • Qwest • Utilities • PowerCore • Ruhrgas Radio Head • Contractors • KrishGlobal • Black & Veatch • NEM • Erricson • Nokia • ALU • Carrier • ATTm • Singtel • Vodafone • China Mobile • ` • RF Distributors • Tessco • Newark IP/Ethernet Mobile Backhaul • Carriers • Korea Telecom • Orange • Long Haul • Level3 • Allied Fiber Baseband Unit Mobile Switching Center Mix of backhaul methods: Copper, Microwave, Fiber • Carriers • TIM • Verizon • Utilities • Duke Power • Neutral Host Providers • American Tower • Extinet Compact Base Stations Base Station RF over Fiber “Fronthaul” Baseband Unit Compact Radio Heads

  30. Next Steps – Campaign Details, Call to Action • FTTA campaign is already in planning. • Webinars • Product Selection Guide. • White papers. • Mobility is a massive revenue stream for our customers. • They will spend money to deploy it faster and better and ensure reliability • They are new to fiber and are hungry for guidance. • Find FTTA opportunities in your region. It is happening and you may not know about it • Operators, NEMS, Wireless Contractors, Wireless Distributors, RF cable manufactures etc. • Create a WIN team with SSO/GTM/PLM to help execute around the project plans. • Invite GTM team to help you build a localized campaign to address your customer pains.

More Related