Bob HarshbargerVolunteer NAESB Update August 29, 2013 Sunny Salt Lake
Traditional Moment for Raymond • Three boys are in the schoolyard bragging of how great their fathers are. • The first one says: "Well, my father runs the fastest. He can fire an arrow, and start to run, I tell you, he gets there before the arrow". • The second one says: "Ha! You think that's fast! My father is a hunter. He can shoot his gun and be there before the bullet". • The third one listens to the other two and shakes his head. He then says: "You two know nothing about fast. My father works for the government. He stops working at 4:30 and he is home by 3:45!!"
Wholesale Electric Quadrant (WEQ) Joint Electric Scheduling Subcommittee (JESS) OASIS Subcommittee (OS) Business Practices Subcommittee (BPS) North American Energy Standards Board (NAESB)
e-Tag 1.8.1.1 testing and roll-out e-Tag 1.8.2 Functional Specification WEQ-004 Coordinate Interchange Business Practice Standards WEQ Electric Industry Registry Business Practice Standards WEQ Electric Industry Registry and the WECC Adjacency Registry (or WIT Registry) NAESB WEQ JESS
1.8.1.1 incorporates WEQ-012 Public Key Infrastructure (PKI) requirements Certificate based security First test was August 8, 2013 with mostly failed results Next test is August 29, 2013 (today) Required EIR publication modification to include Authorized Certificate Authorities September 10, 2013 roll out Urge your vendor to get it right e-Tag 1.8.1.1 Testing and Roll-out
Modifications for Network Integration Transmission Service on OASIS Many other stuff (next two slides) e-Tag 1.8.2 Functional Specification
Modified 6.1.1 Transaction Types to include Recallable Clarified ramp duration validation in 6.1.4. Included 2 graphics. Modified 6.1.5 to allow multiple PSEs and a single Transmission Service Provider (stacked tags). Modified 1.4.7 to reference a single Transmission Service Provider. Clarified processing of after-the-fact adjustments for DYNAMIC and PSEUDOTIE e-Tags in multiple sections Modified 6.1.1 definition of PSEUDOTIE transaction type Created Appendix B – After-The-Fact Timing Considerations Removed references to 168 hours and one hour durations and replaced them with a reference to Appendix B. e-Tag 1.8.2 Functional Specification
Created Appendix C – XML e-Tag examples Clarified ramp overlap and assorted related topics. Modified Section 6.1.5 for tagging of NITS Resources. Modified Section 4.6.1.2 to allow any Market Operator on the Physical Path to adjust the Market Level Profile. Deleted Interchange Transaction definition; added Tagged Transaction definition in Section 1.2. Added Section 1.7, Service Transfers Added Creating Purchasing Selling Entity (CPSE) definition e-Tag 1.8.2 Functional Specification
Voted out of JESS on March 6, 2013 Posted for 30-day formal comment on March 7, 2013 Received 4 comments NAESB WEQ Standard Review Subcommittee SPP BPA ISAS Leadership JESS met April 23, 2013, developed responses to comments e-Tag 1.8.2 Functional Specification
JESS has, in its late comments to the WEQ EC, recommended the specification be remanded back to JESS for further development. The WEQ EC remanded back to JESS and asked that two issues be worked upon: Address standard request R13004 from BPA and CISO for consideration of expanded role of registered Market Operators in e-Tag Address the long-standing multiple control of a single reliability limit profile per tag issue e-Tag 1.8.2 Functional Specification
Request R13004: BPA and the CA ISO identified in both e-Tag 1.8.1.1 and 1.8.2 and in NAESB WEQ-004 a lack of guidance for use of tagging fields in both the Market Segment and Physical Segment when entities sell to or buy from a Market Operator (i.e., ISOs and RTOs). JESS participants at the July meeting considered revising “allowed” entities in various roles within an e-Tag, but some pointed-out that approach would require significant work. JESS participants then suggested the registration of product codes in the EIR such as “Market”. BPA and CISO were asked to consider this option e-Tag 1.8.2 Functional Specification
At the August JESS meeting BPA and CISO were asked if the new product registration proposal was still good with them. They said yes. JESS created a “no action” recommendation on R13004 (since no standard would be changing). The new EIR products can be requested via an EIR Enhancement Request form submitted to the NAESB office. e-Tag 1.8.2 Functional Specification
Single reliability limit profile per tag and multiple entities that can request an adjustment. ISAS leadership and representatives are seeking to resolve the long-standing issue. At the July JESS meeting reviewed five possible approaches. At the August JESS meeting settled on “option 5”, the most complicated but most effective approach. Created a white paper and request for informal comments. e-Tag 1.8.2 Functional Specification
Go to http://www.naesb.org/committee_activities.asp Go to the August 15, 2013, WEQ JESS row Read the request Read the white paper Discuss at dinner Submit comments Due date is Friday September 6, 2013 e-Tag 1.8.2 Functional Specification
Modifications to support Order 764 Western Timing Table WEQ-017 default ramp durations Recommendation voted out at August JESS meeting Currently posted for formal comment at: http://www.naesb.org/weq_request.asp Corresponding changes related to NERC INT Rewrite effort (Project 2008-12) General clean-up WEQ-004 Coordinate Interchange Business Practice Standards
Developed business practice standards to drive functionality of the EIR and behavior of its users. Approved at August WEQ EC meeting Currently out for member ratification – due date September 23, 2013 WEQ Electric Industry Registry
Absorb the WECC “WIT” or “adjacency” registry into EIR Underway TSPs and BAs need to finish-up Phase-out CSV and mdb publication formats leaving only the XML format Also includes retiring the ftp site WEQ EIR Phase 3
Pre-emption/competition continued FERC Order 890 related 8 “individual assignments” Target for a recommendation 1Q 2014 Meetings….. NAESB WEQ OS
Learning to work with the IDC Association since NERC no longer involved in ”tools” Working on: seams agreements Pseudo-ties Will recommend a 12-18 month test period in 2014 NAESB WEQ BPS - Parallel Flow Visualization
MOD-A, Project 2012-05, ATC Standards, modification of MOD-001, 004, 008, 028, 029, and 030 “Informal Development” most of this year First standards drafting team meeting this week in Colorado Springs, CO West is fortunate to have Dede Subakti (CAISO) and James Randall (BPA) on the team NERC seeking strip majority of the reqirements out of those standards NERC Standards Activities
Coordinate Interchange Standards Draft Team, Project 2008-12, INT rewrite Informal comment period just ended CISDT meeting next week in Alburquerque, NM to address comments and prepare for balloting Tag Psuedo-tie and Dynamic Schedules Tag intra-BA transactions NERC staff has wanted more stripped out of those standards than the team NERC Standards Activities