40 likes | 204 Views
GIADA Team Meeting 19 October 2011. GIADA “State of art”. Roberto Sordini . SCHEDULE. Calibration setup: Deadline 1/11/2011 Calibration System Requirements ✓ System Calibratio Design ✓ 50 % Calibration System Assembly and Verification ✗
E N D
GIADA Team Meeting 19 October 2011 GIADA“State of art” Roberto Sordini
SCHEDULE • Calibration setup: Deadline 1/11/2011 • Calibration System Requirements✓ • System Calibratio Design ✓ 50% • Calibration System Assembly and Verification✗ • Data AnalisysDeadline 11/11/11 • MBS ✓ up to PC10 • GDS ✓up to PC10 • IS ✓up to PC10 • Geometrical Information ✓ up to PC10 • Data Archiving • Download of new geometrical file ✓ • Creation of PDS files for PC12 and PC13 ✓ • PCs reports production in progress • CalibrationActivities • IS cal position ✗ • GDS caluniformivity✗ • IS calMomentum✗ • GDS calMaterials✗
Data Analysis Creation of a plug-in to read PDS data in DIAdem (by Vincenzo della Corte) Production of routines to select and analyze PDS Data Analysis of MBS , GDS an IS data by DIAdem for PC01-PC10 NextStep: to selectanalysis to perform, also for PC12 PC13 and SteinsFly-By, and create an articleabout GIADA during the PCs.
Data Archiving Solvedproblems with ESA Rosetta FTP , we : • download the geometrical information for PC12 and PC13. • Create PDS files of PC12 and PC13 • Modify some maindiagram • Create a new reports version: smaller, clearer and more understandable