Skarv – Idun Leverandørseminar . 6. juni 2007 - Sandnessjøen. Agenda. BP og HMS presentasjon, Øystein Johnsrud BP (30min) Skarv Idun Oppdatering, Kjell Magne Madsen BP – (30 min) LOG/LOG Nord – Leverandørnettverk, Eirik Hansen (LOG Nord) – (20 min)
E N D
Skarv – Idun Leverandørseminar 6. juni 2007 - Sandnessjøen
Agenda • BP og HMS presentasjon, Øystein Johnsrud BP (30min) • Skarv Idun Oppdatering, Kjell Magne Madsen BP – (30 min) • LOG/LOG Nord – Leverandørnettverk, Eirik Hansen (LOG Nord) – (20 min) • Rørtjenester i.f.m. Boring, Håkon Haaland (Sumitomo) – (30 min) • Stigerør, Harald Bø(Technip) – (30 min) • Borerig, Jan B Fossen/Ole Andreas Holm (Awilco) – (30 min)
Development Concept – FPSO ResourcesBase Case (Skarv, Tilje, Idun) 425 mmboe FPSO Production Facility Design Life 25 years Accommodation 100 POB (single cabins) Oil Production Capacity 85,000 bbls/d Gas Plant Capacity 670 mmscfd Gas Export capacity 650 mmscfd Gas Injection Capacity 250 mmscf/d Topsides 16,500 Te Hull 35,000 Te Turret / Moorings 9,000 Te Subsea Base Case: 16 wells, 5 subsea templates, flexible risers ExportOil via tandem stern shuttle tanker export Gas via new 80 Km 26” spur pipeline to ÅTS pipeline SchedulePDO Submission - End 2Q 2007 First Production - 3Q 2011
Skarv FPSO 2 P600 Methanol & Chemical Injection P400 1st/2nd Stage Recompression 3rd Stage Recompression Fuel Gas, U800 Power Generation P200 Export compressors Bulk Loading FKO Drums P300 Gas Treatment & Gas Injection P500 Separation, Produced Water Treatment T750 Turret, Turntable TAS
Skarv FPSO 3 Turret 2100 T Turntable 2500 T Swivel 375 T TAS 1000 T P600 2111 T U800 2642T P500 2163 T P400 2181 T P200 2491 T P300 2055 T 4 Modules 23.2 m x 46.1 m x 9 m high 1 Modules 15.2 m x 46.1 m x 9 m high 1 Module 28.8 m x 50 m x 9 m high
SURF Overview Key Design Features • Template Architecture (5 templates) • Drill Thro’ Horizontal Trees (16 wells) • Manifold Flexibility • LP/HP headers • GI/GP switch over • Multiphase metering • Rigid Spools • CRA Production Flowline Materials • Individual Flowlines (~44 km) • Bundle Option • Gas lift supply in umbilicals • Wet Insulation • DEH for Idun • Flexible Risers (10 inc export) • Static Umbilicals (~21 km) • Dynamic Umbilicals (2 control + 1 power)
Export Pipeline System • Ongoing Design Activities • On-bottom stability analysis • Expansion & buckling analysis • Cathodic protection design • Tie-in & spool design • Material data sheets • Spool design optimised • L-shaped spools to simplify installation ERB Piping Layout ERB Tie-in Layout PLEM Tie-in Layout
Skarv Idun en mega-utbygging i Norskehavet • PUD inn i slutten av juni 2007 • PUD forventet godkjent i desember 2007 • Produksjonsstart august 2011 • Invisteringer på omkring 30 milliarder kroner
FPSO (tall i million kroner)
Subsea (tall i million kroner)
Boring (tall i million kroner)
Rockdumping - tilbyderliste Boskalis Offshore Rosmolenweg 20 P.O. Box 43 3350 AA Papendrecht The Netherlands * Mr. S.G.M. van Bemmelen, Proposals Manager: s.g.m.vanbemmelen@boskalis.nl * Mr. B.J.F. de Waard, Proposals Engineer: b.j.f.dewaard@boskalis.nl Tideway BV Topaasstraat 64 P.: Box 7074 4800 GB Breda The Netherlands *Serge Parera Parera.serge@dredging.com *Saskia Albers Aalbers.saskia@dredging.com) Van Oord Offshore bv 2 Jan Blankenweg 4207 HN Gorinchem P.O. Box 458 4200 AL Gorinchem The Netherlands Rene van Kessel - Regional Manager - Subsea Rock Installation - e-mail address rke@vanoord.com Steve de Koning - Commercial Manager - Subsea Rock Installation - e-mail address sko@vanoord.com
Valhall Oppdatering 6. juni 2007 - Sandnessjøen
Valhall, nytt feltsenter • New Facility Design Life - 40 years • Hotel - 180 single bed cabins • Oil production capacity - 150 mbopd • Gas handling capacity - 5 million Sm3/day • Total liquid capacity - 200 mbpd (oil & water) • Weight topside + hotel ~15 000 tne Weight jacket ~ 7 500 tne • Power from Shore - 292 km HVDC cable • Oil Export - Future offshore loading/EOR • Project Sanctioned Q1 2007 • Platform start up - 2010
Valhall kontrakter • Prosjektering og innkjøp – Mustang (Houston)/Fabricom (Stavanger) • Prosjektering og utstyrsleveranse, kraftforsyning fra land, ABB (Oslo/Sverige) • Strømkabel design, fabrikasjon og installasjon, Nexans Norge • Fabrikasjon av dekk + oppkobling av moduler, Heerema Holland • Fabrikasjon av boligkvarter og ”kraftmodul”, SLP UK • Stålunderstell, Aker Verdal • Prefabrikasjon og offshore modifikasjoner, Aker Kvaerner Offshore Partner Stavanger • Undervannsmodifikasjoner, Subsea 7, Stavanger • Kontrollsystem, ABB Sandnes/Oslo
Hvordan bli en leverandør til BP Norge • Identifiser og etabler kontakt med kunden (sluttbruker i BP) • Registrerer firmaet i Achilles som godkjent leverandør med oppdaterte opplysninger • HMS - Egenvurdering (NORSOK S-006) • Produkter/tjenester • Oppfyll minimumskrav til HMS. • Systemer og prosesser for HMS & K • HMS Resulter HMS spiller en viktig rolle i tildelingen av oppdrag! Vi finner dere ikke hvis kompetansen deres ikke er registrert!
Hva vi ser etter hos leverandører • HMS ledelse . • Oversikt over dokumentert kompetanse • De rette produktene/tjenestene • Life cycle cost • Evne til gjennomføring • Ability to deliver vendor data • Ønskede egenskaper • Bere bruk av teknologi • Forbedret driftseffektuvitet • Verdiskaping • Nyskapende, kreativ, proaktiv • Vilje til å dele idéer
BPs prinsipper for innkjøp • Forholder oss til norsk lov (EU Procurement Directive) • Bruker Achilles leverandørsystem (www.achilles.no) • Foretar pre-kvalifisering når det er nødvendig • Opptatt av å utvikle lokal industri til å komme i posisjon • Arbeider etter strenge etiske regler - ”BP’s Code of Conduct” • Evalueringen foretas etter pre-definerte retningslinjer • Evalueringskriterier vil være individuelt tilpasset hvert anbud og vil fokusere • på levetidskost, helse-miljø-sikkerhet, kvalitet, referanser, effektivitet etc.