1 / 15

Conformance to applicable provisions of the:

sheena
Download Presentation

Conformance to applicable provisions of the:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GTSTRUDL Software QA/QCConformance to the U.S.A. Nuclear Regulatory Commission’s Rigorous Quality Assurance and Quality Control RequirementsforSafety Critical Structural Engineering Software(Beginning in 1983)Leroy Z. Emkin , Ph.D., P.E., F.ASCEFounder and Co-DirectorComputer Aided Structural Engineering CenterGeorgia Institute of TechnologyAtlanta, Georgia 30332-0355 U.S.A.Tel: +1-404-8942260Fax: +1-404-8948014email: casec@ce.gatech.eduWeb Page: www.gtstrudl.gatech.edu

  2. GTSTRUDL QA/QC Requirements of the U.S.A. Nuclear Regulatory Commission’s Safety Critical Structural Engineering Software GTSTRUDL is the ONLY Civil/Structural software system that has fully conformed to the NRC quality regulations since 1983, and it continues to be the highest quality civil/structural software system available in the world today Civil/Structural Engineering

  3. GTSTRUDL QA/QC Requirements of the U.S.A. Nuclear Regulatory Commission’s Safety Critical Structural Engineering Software Conformance to applicable provisions of the: United States Nuclear Regulatory Commission (U.S. NRC) Rules and Regulations, Volume 10, Code of Federal Regulations, Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants (NRC 10CFR50, Appendix B). United States Nuclear Regulatory Commission ("U.S. NRC") Rules and Regulations, Volume 10, Chapter 1, Code of Federal Regulations - Energy, Part 21, Reporting of Defects and Noncompliance (NRC 10CFR21). American Society of Mechanical Engineers for the American National Standards Institute "Quality Assurance Requirements for Nuclear Facility Applications“ (ASME NQA-1-2000). International Standards Organization (ISO) "Guidelines for the Application of ISO 9001 to the Development, Supply and Maintenance of Software“, ISO 9000-31991 (ISO 9000-3). 3

  4. GTSTRUDL QA/QC Requirements of the U.S.A. Nuclear Regulatory Commission’s Safety Critical Structural Engineering Software Conformance to applicable NRC requirements Comprehensive User Documentation (16 Volume Set) Civil/Structural Engineering

  5. GTSTRUDL User Reference Manual16 Volume Set(over 11,000 pages) 5

  6. GTSTRUDL QA/QC Requirements of the U.S.A. Nuclear Regulatory Commission’s Safety Critical Structural Engineering Software Conformance to applicable NRC requirements Comprehensive User Documentation (16 Volume Set) QA/QC Procedures Manual (118 page document) 6

  7. GTSTRUDL QA/QC Requirements of the U.S.A. Nuclear Regulatory Commission’s Safety Critical Structural Engineering Software Conformance to applicable NRC requirements Comprehensive User Documentation (16 Volume Set) QA/QC Procedures Manual (118 page document) Proof of developer qualifications Education Experience Knowledge and areas of specialization Programming skills Awareness of, and commitment to, QA/QC procedures 7

  8. GTSTRUDL QA/QC Requirements of the U.S.A. Nuclear Regulatory Commission’s Safety Critical Structural Engineering Software Conformance to applicable NRC requirements Comprehensive User Documentation (16 Volume Set) QA/QC Procedures Manual (118 page document) Proof of developer qualifications Detailed records of changes to software: Approximately 2.0 Million Lines of Code & 10,000 Subprograms Why was the change made Who made the change When was the change made Where in the program was the change made Who developed the test problems When were the test problems run What was the result of the test problems What Manager signed and verified that the change process was conducted in accordance with NRC quality regulations and the GTSTRUDL QA/QC Procedures Manual 8

  9. GTSTRUDL QA/QC Requirements of the U.S.A. Nuclear Regulatory Commission’s Safety Critical Structural Engineering Software Conformance to applicable NRC requirements Comprehensive User Documentation (16 Volume Set) QA/QC Procedures Manual (118 page document) Proof of developer qualifications Detailed records of changes to software Base Verification Manual published for each new version of software (3 Volumes, 2,150 pages, 324 test problems) Civil/Structural Engineering

  10. GTSTRUDL QA/QC Requirements of the U.S.A. Nuclear Regulatory Commission’s Safety Critical Structural Engineering Software Conformance to applicable NRC requirements Comprehensive User Documentation (16 Volume Set) QA/QC Procedures Manual (118 page document) Proof of developer qualifications Detailed records of changes to software Base Verification Manual published for each new version of software (3 Volumes, 2,150 pages, 324 test problems) General QA/Verification Test Problems (3,792 test problems) Civil/Structural Engineering

  11. GTSTRUDL QA/QC Requirements of the U.S.A. Nuclear Regulatory Commission’s Safety Critical Structural Engineering Software Conformance to applicable NRC requirements Comprehensive User Documentation (16 Volume Set) QA/QC Procedures Manual (118 page document) Proof of developer qualifications Detailed records of changes to software Base Verification Manual published for each new version of software (3 Volumes, 2,150 pages, 324 test problems) General QA (more than 3,792 test problems) Archive each new version of software (40 Years) Civil/Structural Engineering

  12. GTSTRUDL QA/QC Requirements of the U.S.A. Nuclear Regulatory Commission’s Safety Critical Structural Engineering Software Conformance to applicable NRC requirements Comprehensive User Documentation (16 Volume Set) QA/QC Procedures Manual (118 page document) Proof of developer qualifications Detailed records of changes to software Base Verification Manual published for each new version of software (3 Volumes, 2,150 pages, 324 test problems) General QA (more than 3,792 test problems) 40 Year Archive for each new version of software Audits by end-users regulated by the NRC 12

  13. GTSTRUDL QA/QC Requirements of the U.S.A. Nuclear Regulatory Commission’s Safety Critical Structural Engineering Software Audits by end-users regulated by the NRC It is the responsibility of the design company that is regulated by the U.S. NRC to pass the responsibility for conformance to NRC's quality standards to the vendor (i.e., supplier) of the structural analysis and design software. Each such regulated company must perform all necessary audits of the structural software vendor and report the results of such audit to both the software vendor and the U.S. NRC. The audit report identifies any deficiencies found, and requires that all deficiencies be corrected. If any identified deficiencies are not corrected within the required period of time, then the software which is the subject of the audit is removed from the list of approved safety related software products. Civil/Structural Engineering

  14. GTSTRUDL QA/QC Requirements of the U.S.A. Nuclear Regulatory Commission’s Safety Critical Structural Engineering Software Conformance to applicable NRC requirements Comprehensive User Documentation (16 Volume Set) QA/QC Procedures Manual (118 page document) Proof of developer qualifications Detailed records of changes to software Base Verification Manual published for each new version of software (3 Volumes, 2,150 pages, 324 test problems) General QA (more than 3,792 test problems) 40 Year Archive for each new version of software Audits by end-users regulated by the NRC (4 to 6 times per year!) 14

  15. GTSTRUDL Quality Assurance Agreement QA Agreement Between an NRC Regulated End- User Company and the Georgia Tech Research Corporation US$12,000 for the first year of the QA Agreement US$6,600 per year thereafter Civil/Structural Engineering

More Related