110 likes | 212 Views
OptIPuter Networks. Overview of Initial Stages to Include OptIPuter Nodes OptIPuter Networks OptIPuter Expansion. OPtIPuter All Hands Meeting February 6-7 UCSD. Compute + Data + Viz Grid: Building Block. Commodity GigE Switch. Generic OptIPuter node is one or more of:
E N D
OptIPuter Networks Overview of Initial Stages to Include OptIPuter Nodes OptIPuter Networks OptIPuter Expansion OPtIPuter All Hands Meeting February 6-7 UCSD
Compute + Data + Viz Grid: Building Block Commodity GigE Switch • Generic OptIPuter node is one or more of: • Cluster: 16 – 128 nodes (160GF – 1.2 TF) • Storage: 0.5TB – 10 TB • Visualization: Desktop, Wall, Immersive • Specialized data source/sink instruments • Connected to other nodes via the OptIPuter Network
Nodes Connected by Optical Routers or Switches High-end DB Server switch switch switch switch Chemistry, Preuss, 6th College, Engineering, Arts School of Med switch • Cluster – Disk • Disk – Disk • Viz – Disk • DB – Cluster • Cluster – Cluster ChiaroRouter SDSC SIO, SDSU UCSD OptIPuter
Initial UCSD OptIPuter Deployment ½ Mile To Other OptIPuter Sites Phase I, Fall/Winter 2002-03 Phase II, 2003 Central hub/router SDSC SDSCAnnex Preuss JSOE CRCA SOM 6thCollege Phys. Sci -Keck Node M SIO
UCSD OptIPuter Network Expansions • Initial anticipated network deployments (Fall 2002, Winter 2003) • 4 GigE connections (using 4 fiber pairs) to high performance nodes • 1 GigE connections (using 1 fiber pair) to other nodes • Each node's OPPP (OptIPuter Point of Presence) is initially a local GigE switch with 4 bondable GigE (GBIC) uplinks • Above nodes uplinks connected to a central GigE aggregate switch • Above is a separate research network (not connected to campus network) • During 2003, upgrade OptIPuter network as required … • N x 10 GigE (over existing fiber pairs?, N could be up to 4) ... and/or • Add lambda gear to conserve fiber (supporting 1 or 10 GigE x N lambdas) • Add management to support dynamic lambda allocation • Add edge (of OptIPuter) router for connecting to campus or remote OptIPuter sites • Late 2003 and 2004 • Interconnect multiple OptIPuter sites (NU, EVL, USC/ISI, UCI, …) • Expand network/lambda management to span sites
15808 Terminal, Regen or OADM site (OpAmp sites not shown) Fiber route NLR Footprint and Layer 1 Topology SEA POR SAC BOS NYC CHI OGD DEN SVL CLE WDC PIT FRE KAN RAL NAS STR LAX PHO WAL ATL SDG OLG DAL
New OptIPuter Participate and Nodes • Research requirements • Contribute to existing OptIPuter goals as defined in • OptIPuter Proposal • NSF Statement of Work • Involve collaboration with existing OptIPuter PI and Co-PIs • Expand OptIPuter project to address new areas of research • Supported by new proposals and resources • Providing new application drivers • Providing integration with new infrastructure • Expanding the optical network testbed • Technical and operational requirements • Network connectivity • Dedicated research fiber/lambda path to OptIPuter network • Appropriate network electronics to support connectivity • Ability to work within experimental network environment • Financial requirements • Impose no financial burden on existing grant • Develop support for • hardware • manpower • connectivity to OptIPuter network