1 / 9

Budgeting for Demo/Loan Programs

Budgeting for Demo/Loan Programs. Diane Golden Linda Jaco Missouri Oklahoma dcgolden@swbell.net Linda.jaco@okstate.edu. Loan Centralized (dropped regional sites) Comprehensive AT High tech focus Stable expertise + grad students Periodic external $ AT AT Act $ operations. Demo

shelley
Download Presentation

Budgeting for Demo/Loan Programs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Budgeting for Demo/Loan Programs Diane Golden Linda Jaco Missouri Oklahoma dcgolden@swbell.netLinda.jaco@okstate.edu

  2. Loan Centralized (dropped regional sites) Comprehensive AT High tech focus Stable expertise + grad students Periodic external $ AT AT Act $ operations Demo Decentralized Began comprehensive AT, now lower focus Expertise level not stable Technical back-up and training available Began $ focus on AT, now option of contractor Missouri Program Structure

  3. Loan Equipment Mean $75K ($150K-$25K) Rarely AT Act External $ focus (VI) High Tech focus Loan Operations $10K grad students $25K supplies/shipping $35K salary/benefits Demo Equipment Had $36K (3 comprehensive centers) Now $21K (3 centers) Demo Operations Had $30K (3 comprehensive centers) Now $15K (3 centers) Demo Combined Now 3 flexible contracts at $15K total Missouri Program Costs

  4. Current Program Costs • Loan: $70K fixed operations • Equipment $25K to $150K (usually external) • Demo: $51K contractual • Allocation for small contracts ($5K) is flexible • Allocation for larger contracts ($12K) is at least half equipment

  5. Loan Decentralized – MOA s (adding and dropping partners) Comprehensive AT (excluding DME) High tech focus Expertise with lead/ partnerships for specialized targeted populations Limited technical assistance/training AT Act $ operations & partnership in-kind Demo Decentralized - – MOA s Comprehensive AT crosses both programs High tech focus Expertise with lead/ partnerships for specialized targeted populations Limited technical assistance/training AT Act $ operations & partnership in-kind Oklahoma Program Structure

  6. Loan Equipment $200K new equip (w/carryover) 100% AT Act Internal $ focus Demo Equipment $200K new equip (w/carryover) $100K to EI kits 100% AT Act Internal $ focus ABLE Tech Start-Up Costs

  7. Loan Operations 1 FTE ($32K) $6.5K overhead Shipping Supplies/Phone Travel $37.5 new equipment External MOAs In-kind Personnel Space Maintenance Demo Operations 1 FTE ($32K) $6.5K overhead Supplies/Phone Phone Travel $37.5 new equipment External MOAs In-kind Personnel Space Maintenance Current Program Costs

  8. Sustaining Loan/Demo • AT Act $ • current federal appropriation would allow approximately $150K annually • $50K State Appropriations • Potentially Early Intervention funds

  9. “Success --- It’s what you do with what you’ve got.” ---- Leroy Van Dyke

More Related