An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 21CMA 21 Centimeter Array a.k.a. PAST

  2. Reionization 21cm: hyperfine transition of neutral Hydrogen

  3. 21CMA a.k.a. PAST Basic ideas: • an experiment, not an observatory • use cheap, off-the -shelf technology (i.e. TV+PC) • simple design (looking at NCP) • choose site with minimal EM interference • to become operational before MWA/LOFAR Xiang-Ping Wu (NAOC) Ue-Li Pen (CITA) Jeff Peterson (Carnegie)

  4. Map of 21CMA site VLBI 21CMA

  5. Ulastai Urumuqi N E

  6. Log-Periodic antenna

  7. A pod (127 antenna) 20m

  8. 21CMA data collection system Optical transmitter Optical receiver array LNA filter amplifier Opt. fibre ADC correlator

  9. Basic Design of 21CMRA At z=9, 10 comoving Mpc  ~ 0.6 MHz,  ~ 3.6 arcmin frequency range 70-200 MHz (6.1<z<19.3) baseline: 2 km, (at 140 MHz, 3.6 arcmin) Collecting Area 104 m2 A/L2 ~ 0.01

  10. Schedule & Status • summer 2003 Ue-Li, Jeff, Xiang-Ping discussed the idea • autumn 2003 site search began, Ulastai chosen • March 2004 7-antennae prototype, first image • August 2004 array design finished • January 2005 batch I (first 20 pods) constructed • summer 2005 batch II (60 pods) construction, data • collecting electronics installation • January 2006 fully operational Total cost estimate: 15-30 M yuan, now borrowing from other groups in NAOC, will apply a grant, please support!

  11. January 1, 2005

  12. 3CR390.3 NCP 3CR061.1 First skymap (dirty) 3C061.1

  13. Dark Energy? • AP test • power spectrum measurement • lensing • ...

  14. Discussion on dark energy observation

  15. Observation Data Dark Energy? Theoretical Assumptions General Relativity Cosmo Principle Model III ModelI Model II

  16. Ways to measure dark energy • Gravitational test: • luminosity distance • angular diameter distance • growth of perturbation • solar system & beyond • Non-Gravitational test: • variation of constants • dark energy interaction • supernovae & GRB • gravitational lensing • cluster • large scale structure • CMB • 21cm • gravitational wave • micro-gravity, solar system & lab

  17. What can we do in China Existing projects: LAMOST, 21CMA New Projects: ?