Santa Rita Jail Going off the Grid. Alameda County/RESCO CCAEA Meeting February 5, 2010. The Energy Program Team. Established in 1987 GSA/TSD 1 Program Manager 1 Project Manager 2 Electrician/Construction Coordinators Project and Cost Savings Oriented Minimum 10% IRR. Accomplishments.
E N D
Santa Rita JailGoing off the Grid Alameda County/RESCO CCAEA Meeting February 5, 2010
The Energy Program Team Established in 1987 GSA/TSD • 1 Program Manager • 1 Project Manager • 2 Electrician/Construction Coordinators • Project and Cost Savings Oriented • Minimum 10% IRR
Accomplishments Energy Program: 1987-2010 • Total Energy Saving Capital Projects Value = $50 M • Total Energy Incentives and Refunds = $28 M • Current Annual Utility Budget = $11.5 M • Current Annual Energy Cost Avoidance = $7.5 M
Juvenile Justice Center LEED Gold 2007 • Results
Santa Rita Jail, Dublin, CA • Construction 1984-1989 • Occupied Space: 1 million sqft. • Peak Electrical Load: 3.2 mW (8/00) • 18 Housing Units • 4300 inmates • 513 Sheriff’s Dept. staff • 80 GSA staff
Santa Rita Jail 2007 Utility Cost • Electricity: $ 980,000 • Natural Gas: $ 900,000 • Water: $ 860,000 • Sewage: $ 540,000 • Total: $ 3,280,000 (35% of GSA’s Utility Costs)
Fluorescent Lighting and Exhaust Fan Motor Retrofit (1995) 9,000 Efficient Light Fixtures Retrofitted 600 Energy Efficient Motors Replaced
Largest Rooftop Solar Power Systemon a Government Facility (2002) $450K Annual Energy Cost Savings, 10% of Energy Used from the Sun
Santa Rita Jail Integrated Energy & Water Efficiency Project (2009):Hot Water Boiler Plant Renovations Four High Efficiency Boiler 2 Domestic Hot Water Heat Exchangers
Santa Rita Jail:Reduced Hot Water Temperature 54 New Hot Water Coils 52 New Hot Water Expansion Compensators
Santa Rita Jail:Lighting Retrofit Gym before retrofit Gym after retrofit • Retrofitted • 9000 Florescent Lighting Fixtures • Permanently Delamped • 7000 Fluorescent Lamps • Replaced • 250 HID with Fluorescent Fixtures
Santa Rita Jail:Water Efficiency Retrofit • Replaced • 160 Staff/Public Toilets • 30 Staff/Public Urinals • 210 Staff/Public Sink Aerators • 30 Staff Showerheads • 8 Smart Irrigation Controllers • Retrofitted • 1400 Inmate Flush Valves • 1400 Inmate Lavatory Valves • 150 Inmate Showers Valves
Santa Rita Jail Energy & Water Efficiency Projects(1993 – 2009) Results • $1.7M in Yearly Electrical Cost Savings: 65% Reduction • $285K in Natural Gas Cost Savings: 40% Reduction • $540K in Water/Sewage Cost Savings: 50% Reductions
Santa Rita Jail:Day Room Induction Lighting Retrofit (Feb 2010) 250W/400W Existing Metal Halide before retrofit 120W Retrofitted Induction after retrofit • Retrofit • 864 Lighting Fixtures • Savings • 243 kW Demand Reduction • 1.7M kWh Energy Reduction
Project Partners • Alameda County, California - Santa Rita Jail • Chevron Energy Solutions • And… 22
SRJ Smart Grid Project Project Goals Existing 1.2MW Solar PV • True system integration of renewable and clean distributed energy resources • Superior Utilization and Control of renewable and clean distributed energy resources • Improved local utility grid stability, and demand response • Improved local power quality and reliability • Off-grid Island capability • Energy price arbitrage capability • Demand Response Capabilities Existing 1.0MW Fuel Cell Smart Grid New 12kW Wind Power Facility Energy Efficiency Measures Reduction of DHW Energy Load New 2MW Battery New Solar Thermal
System Design – Load Impacts Cloudy Spring Day – Solar Output Uneven 25
Santa Rita JailSmart Grid Project Total Project Cost: $12,100,000 Funding: • DOE Grant: $ 6,200,000 • RESCO Grant: $ 1,980,000 • PG&E Incentive $ 3,000,000 • Chevron ES Share: $ 120,000 • PG&E Share: $ 350,000 • County Share: $ 450,000