140 likes | 322 Views
SS Buildon is a reputed developer by the name of Shiv Shankar in Noida region offering 1bhk, 2bhk, 3bhk flats in Noida
E N D
SS BUILDCON pvt ltd 1/2 BHK flats :-: Shriradheshyamvatika http://ssbuildcon.in/projects.aspx 09654420786
Profile • Shiv Shankar buildcon one name that rules real estate market. The Builder has launched so many residential projects and has received enormous success. To continue the story of victory the builder has launched ShriRadheShyamVatikaat Noida. ShriRadheShyamVatika offers you 1/2 bhk flats in noida with Great features and Ultimate amenities. ShriRadheShyamVatika is very perfect for living and location wise also project is suitable for everyone and has great connectivity with Delhi/NCR. ShriRadheShyamVatika is offering amenities like Spacious flats, nice specification , high tech security, Power back up, Water supply, PNG connection, Gym, Pool, Gardens, Spa and many more.. • Come and enjoy the sprawling greens at ShriRadheShyamVatika. http://ssbuildcon.in/projects.aspx
Shriradheshyamvatika –Features • One Car parking for each Apartment. • Gated Cadmium ensuring round the clock manned security with CCTV monitoring. • Eco friendly Architect design. • Club house with swimming pool, gymnasium and party hall. • Convenient Shopping Facility. • Jogging park inside the campus. • Water Softening plant in the campus. • Dedicated walking street. • Rainwater Harvesting. • Continuous water supply round the clock. http://ssbuildcon.in/projects.aspx
Shriradheshyamvatika –Features • 100% power Backup. • Earthquake Resistant Structure. • Restricted entry for the petty vendors. • Efficient Solid waste disposal systems. • Finest Academic/professional institutes in clod proximity. • Intercom and AV Camera Facility in Every Unit. • Medical and house hold facility on call. • Free Hold Apartment. • ATM, Unisaloon, Clinic, Provision Store, Dry Cleaner, Vegetable Shop, Milk Booth. http://ssbuildcon.in/projects.aspx
specifications • Structure:1. Earthquake Resistant R.C.C. Framed Structure.2. The structure design will be vetted by IIT. • FINISHES:1. Internal wall plastered and painted with pleasing shades of oil-bound distemper or equivalent.2. Permanent weather coated heat reflective texture paint on external walls or equivalent.3. Glazed/Ceramic tiles up to 7 ft. Height, wash basin, EWC, towel rail and other accessories i toilets. 4. Pre-polished granite plat form with stainless steel sink, dado up to 2”-0” height above platform in ceramic glazed tiles. http://ssbuildcon.in/projects.aspx
specifications • FLOORING:1. Vitrified floor tiles in drawing, dining room and bed rooms.2. Wooden flooring in master bed-Room.3. Anti-skid ceramic floor tiles in kitchen and toilets.4. Kota stone in corridors, staircase and lobbies. • DOORS & WINDOWS:1. Malaysian Sal wood or equivalent wood frame for doors.2. Main door of panelled teak with brass fittings.3. Other doors if hardwood frame and side teak finished/skin mounded shutters.4. All doors opening in balconies and all windows of powder-coated glazed aluminium.
Floor plans http://ssbuildcon.in/projects.aspx
sitemap http://ssbuildcon.in/projects.aspx
Location map http://ssbuildcon.in/projects.aspx
Mode of payment Plan A (DP) • At the of booking • Within 30 days of booking • At the of possession • 15% on total cost • 80% on total cost • 5% on total cost http://ssbuildcon.in/projects.aspx
Mode of payment Plan B (flexi Plan) • At the time of booking • Within 45 Days of booking • At the time of Faundation • On start of Ground Floor Slap • On start of 1st Floor Slap • On start of 2st Floor Slap • On start of 3st Floor Slap • On start of 4st Floor Slap • On start of 5st Floor Slap • At the time of Possession • 15% on total Value • 20% on total Value • 10% on total Value • 10% on total Value • 10% on total Value • 10% on total Value • 10% on total Value • 5% on total Value • 5% on total Value • 5% on total Value http://ssbuildcon.in/projects.aspx
Mode of payment Plan B (CLP) • At the time of booking • Within 45 Days of booking • At the time of Faundation • On start of Ground Floor Slap • On start of 1st Floor Slap • On start of 2st Floor Slap • On start of 3st Floor Slap • On start of 4st Floor Slap • On start of 5st Floor Slap • On start of 6st Floor Slap • At the time of Finishing • At the time of Possession • 15% on total Value • 10% on total Value • 10% on total Value • 10% on total Value • 10% on total Value • 10% on total Value • 10% on total Value • 5% on total Value • 5% on total Value • 5% on total Value • 5% on total Value • 5% on total Value http://ssbuildcon.in/projects.aspx
Contact us • Corporate Office : • Phone No • Email Id : • SS BUILCON PVT LTD. AAC-007/A, First Floor, Shipra Krishna Azure Behind Wave Cinema, Kaushambi-201010 • 09654420786 • 09711013400 • info@ssbuildcon.in