40 likes | 294 Views
Quality Assurance and Quality Control are inherent in any MILCON project. Responsibilities. USACE ? Overall QA responsibility for MILCON. USAISEC-FDEO ? QA oversight for IS design, acquisition, implementation, and testing when the local installation (DOIM) is not able to execute. DOIM
E N D
1. QUALITY CONTROLPresentersELLIS CULLIFERNETCOM RCIO-NE&JOHN VERBANICKISEC-FDED
2. Quality Assurance and Quality Control are inherent in any MILCON project.Responsibilities. USACE – Overall QA responsibility for MILCON. USAISEC-FDEO – QA oversight for IS design, acquisition, implementation, and testing when the local installation (DOIM) is not able to execute. DOIM has overall responsibility for IM/IT.
3. TECHNICAL SPECIFICATIONUSACE and USAISEC-FDEO jointly use publish Unified Facilities Guide Specifications (UFGSs) UFGS 16710A Premises Distribution System UFGS 16711A Telephone System, Outside Plant UFGS 01312A Quality Control SystemHTTP://WWW.CCB.ORG/UFGS/UFGS.HTM
4. TRAINING