1 / 5

Pass Dell EMC E22-285 VCE Exam PDF 2018 - [DOWNLOAD and Prepare]

Dell EMC E22-285 EXAM SYLLABUS IS UPDATED – GET LATEST EXAM QUESTIONS: The Dell EMC VxRail Appliance 4.x Deployment and Implementation exam E22-285 is a 90-minute assessment with 80 questions. Likewise, the Dell EMC E22-285 VxRail Appliance certification exam verifies the candidate's acquaintance and core understanding with the hardware installation and VxRail cluster. E22-285 VCE Exam Software exam is associated with the VxRail Appliance Certification. 90 Exam helps you to upgrade credential, as the content is aligned with the exam topics;<br>Introduction to VxRail,  <br>VxRail Hardware Installation, and<br>VxRail Pre-installation Validation.https://www.vceexamstest.com/E22-285-vce-test.html

shopia
Download Presentation

Pass Dell EMC E22-285 VCE Exam PDF 2018 - [DOWNLOAD and Prepare]

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Questions & Answers PDF Page 1 EMC E22-285 Exam VxRail Appliance 4.x Deployment and Implementation Exam Thank you for downloading E22-285 exam PDF Demo You can also try our E22-285 practice exam software Download Free Demo: https://www.vceexamstest.com/E22-285.html https://www.vceexamstest.com

  2. Questions & Answers PDF Page 2 Version: 8.0 Question: 1 Which user provided block of IP addresses to the VxRail initialization wizard may contain non-contiguous addresses? A. VMware Virtual SAN B. ESXi host C. vSphere vMotion D. NTP Servers Answer: D Question: 2 A company wants to deploy VxRail on V Series nodes as a proof-of-concept (POC). Only one Top of Rack (ToR) switch has been provided for the POC. What is the Dell EMC best practice recommendation in this situation? A. Connect the first host NIC to the ToR switch. Leave the second host NIC un-cabled. B. Connect each host NIC to a port on a different switch packet buffer bank on the ToRswitch. Balance the ports across two packet buffer banks. C. Inform the company that the POC cannot proceed without a second ToR switch. D. Connect the first host NIC to the TOR switch. Daisy chain the second NIC between hosts. Answer: B Question: 3 When preparing for a VxRail deployment, which components require forward and reserve DNS records? A. ESXi hosts, vRealize Log Insight, and Platform Services Controller B. Platform Services Controller. vCenter, and ESRS/VE C. ESXi hosts, vCenter, and vRealize Operations D. ESXi Hosts, vCenter, and ESRS/VE Answer: A Explanation: Reference: https://www.emc.com/collateral/guide/vxrail-quickstart-guide.pdf https://www.vceexamstest.com

  3. Questions & Answers PDF Page 3 Question: 4 What is the correct command to restart the Loudmouth process on a VxRail node? A. /usr/lib/vmware-loudmouth/bin/loudmouthc restart B. systemctl restart vmware-loudmouth C. /etc/init.d/loudmouth restart D. /sbin/service loudmouth restart Answer: C Explanation: Reference: https://pbradz.wordpress.com/category/vxrail/ Question: 5 What is the VxRail maximum cluster size if using only 1 GbE links? A. 8 B. 16 C. 32 D. 64 with an RPQ Answer: A Explanation: Reference: https://www.emc.com/collateral/specification-sheet/vxrail-4.0-spec-sheet.pdf Question: 6 When adding a VxRail node the validation fails. What could be the cause of this problem? A. IPv6 multicasting is not enabled B. Only one network interface online C. Time on the node was not set correctly D. DNS record was not created Answer: B Explanation: Reference: https://community.emc.com/thread/236186?start=0&tstart=0 https://www.vceexamstest.com

  4. Questions & Answers PDF Page 4 Question: 7 You are asked to cable up a VxRail G Series cluster to a redundant pair of 1/10G switches. What is the cabling best practice for this configuration? A. Cable ports 1 and 2 to oneswitch. Cable ports 3 and 4 to the other switch. B. Cable ports 1 and 2 to one switch. Cable ports 3 and 4 to the other switch. Cable BMC from node 1 and 2 to one switch. Cable BMC from node 3 and 4 to the other switch. C. Cable ports 1 and 3 to one switch. Cable ports 2 and 4 to the other switch. D. Cable ports 1 and 3 to one switch. Cable ports 2 and 4 to the other switch. Cable BMC from node 1 and 3 to one switch. Cable BMC from node 2 and 4 to the other switch. Answer: D Question: 8 A company is in the process of configuring their Top of Rack (ToR) switches as a single rack that replicates to a secondary data center with vSphere Replication. What is a consideration for this configuration? A. IPv6 and IPv4 multi-cast should be layer-3 routed between data centers B. IPv6 and IPv4 multi-cast should span the entire network in each data center C. IPv6 and IPv4 multi-cast traffic does not need to leave the ToR switches D. IPv6 and IPv4 multi-cast traffic should span layer-2 between data centers Answer: B https://www.vceexamstest.com

  5. Questions & Answers PDF Page 5 Thank You for trying E22-285 PDF Demo To try our E22-285 practice exam software visit link below https://www.vceexamstest.com/E22-285.html Start Your E22-285 Preparation [Limited Time Offer] Use Coupon“20OFF” for special 20% discount on your purchase. Test your E22-285 preparation with actual exam questions. https://www.vceexamstest.com

More Related