An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Advanced Accelerator Technologies R&D Facility Layout Options Discussion 12th May 2011 Neil Bliss

  2. Proposed DELTA Layout

  3. Are the sizes shown reasonable ? • Laser room 5m x 4m • Test areas 5m x 5m • Shielding assumed @ 2m • Gun and diagnostics line 9.8m x 5m Labyrinth access to add in 3 rooms Acc. Test Room 2 5m x 5m Acc. Test Room 1 Acc. Test Room 3 Switching Magnet 9.8 m Diag. Laser Room 5m x 4m Gun 5 m

  4. Is the DELTA footprint and location to be reserved for future development ? • Does the Industrial test facility need to be kept when DELTA is built ? i.e. 2 separate facilities running in parallel • Is the Industrial test facility gun the gun that will be used on DELTA ?

  5. DELTA & Industrial Test Facility with shared injector ? Acc. Test Room 2 Acc. Test Room 1 16 m Acc. Test Room 3 5m x 5m 5 m Diag. Switching Magnet Gun Switching Magnet Laser Room 5m x 4m

  6. Start build in previous proposed DELTA location with longest possible FEL length • Remove existing shielded areas – start again

  7. 16 m Acc. Test Room 3 5m x 5m 5 m Diag. Switching Magnet Gun Switching Magnet Laser Room 5m x 4m Acc. Test Room 2 Acc. Test Room 1

  8. Upgrade path • Start build in SRS booster vault ? • Extend towards car park • Variation of this layout possible with existing SRS linac & booster shielded rooms