Program Overview Fulton County School District EDUCATIONAL SPECIFICATION January 11, 2011
Introductions Presenters Mr. Leonard Box, Operations Area Superintendent Ms. Karen Cox, Principal Mr. John Anderson, Principal Mr. William Bradley, Principal Mr. Patrick Burke, Chief of Operations 2 2 2 2
FCS – Education Specification Work Session • Today’s Work Session Presentation: • Recap of Progress to Date for Finalization of Updated Baseline Ed Spec • Recap of Recommended Square Footage / Reconfiguration Changes for ES/MS/HS • Recap of Design Requirement Changes • Recap of Workflow for Future Changes 3 3 3 3
FCS – Education Specification Work Session • Work Session Presentation • Based on the following documents forwarded for your reference • ES Summary and Detailed Recommended Changes: • ES Prototype Inventory Drawing with Highlighted Changes • Birmingham ES – Courtyard Prototype • MS Summary and Detailed Recommended Changes: • MS Prototype Inventory Drawing with Highlighted Changes • Renaissance MS – One Story Prototype • HS Summary and Detailed Recommended Changes: • HS Prototype Inventory Drawing with Highlighted Changes • Banneker HS – Prototype • Design Requirement Recommendation: • Changes by Division • Ed Spec Documents: • Updated Ed Spec & Historical Summary Changes • Design Requirements 4 4 4 4
FCS – Educational Specification Work Session Elementary Education Specifications by John Anderson 5 5 5 5
Capital IV – Elementary School Educational Specifications COST RELATED REVISIONS Justification Proposed Revision To meet the demands of student produced ceramic work in compliance with Ga. Performance Standards Increase size of Kiln Room to accommodate 2nd kiln Section 4 Art Increase will allow for larger teaching area in the event these CRs are divided Increase duplex CRs from 784 sq. ft. (average) to 950 sq. ft. Section 7 Srvs for Exceptional Students Section 11 Bldg Srvs • Add two small custodial closets @ 30 sq. ft./ ea. • Add two IDF rooms @ 75 sq. ft./ ea. • Increase interior/ exterior custodial storage to 670 sq. ft. Additional custodial storage is needed to better service the school and store supplies and equipment Total 1153 $178,051 0
Capital IV – Elementary School Educational Specifications NON-COST RELATED REVISIONS Justification Proposed Revision Create direct access for students to Computer Rm. via Media Rm., reduces IU by 1 Add door between existing Computer Lab and Media Reading Room Section 3 Media Cntr Section 5 Music Section 8 Admin Section 10 Nutrition Elimination of school band /orchestra programs lends to reallocation of space for chorus and general music for students. Redesign existing space to create two music rooms vs. three Redesign existing space to allow for additional offices and storage Provide office space for itinerant support staff and secure storage for testing materials Redesign existing space to allow for additional serving line Provide 1 additional serving line and decrease congestion at dish wash, teacher dining, and main entrance Total 0 $0 -1 7
FCS – Educational Specification Work Session Middle School Education Specifications by Karen Cox 8 8 8 8
Capital IV – Middle School Educational Specifications COST RELATED REVISIONS Justification Proposed Revision To meet the demands of student produced ceramic work in compliance with Ga. Performance Standards Increase classroom size due to GDOE requirements, and increase the size of Kiln Rm. to accommodate 2nd kiln Section 4 Art Increase will allow students to have larger rehearsal space and instrument storage rooms Increase rehearsal suites and storage Section 5 Music Section 9 Student Services Add one (1) social worker office Provides social worker with office space and confidential area for student / parent conferences Size increase to meet current GDOE requirements Increase business computer laboratory size Section 13 Career Tech Total 3173 $530,521 0 9
Capital IV – Middle School Educational Specifications NON-COST RELATED REVISIONS Justification Proposed Revision Redistribution of allocated space to allow for more gym floor and locker room space Section 6 Health / PE Section 8 Admin Section 10 Nutrition Section 11 Building Svcs. More gym floor square footage accommodates H/PE, music groups/events more seating Provide greater entry security, needed office space for itinerant personnel, & secure test storage Redistribution of allocated space for improved security, offices, & test security storage Provide1 additional serving line to decrease congestion, allowing more student eating time at dining tables Redesign existing space to allow for additional serving line Move surveillance system to MDF closet Provides security and cooling for the camera system Total 0 $0 -1 10
FCS – Educational Specification Work Session High School Education Specifications by William Bradley 11 11 11 11
Capital IV – High School Educational Specifications COST RELATED REVISIONS Justification Proposed Revision Section 2 Classroom Type 2 To accommodate 32 students and provide separation between lab and desk areas. Increase size of science laboratories – physics, biology, chemistry, anatomy, etc. To meet the demands of student produced ceramic work in compliance with Ga. Performance Standards Increase size of Kiln Room to accommodate 3rd kiln Section 4 Art Section 5 Music Increase rehearsal suites and storage Increase will allow students to have larger rehearsal, and instrument storage rooms Section 7 Svcs to Except Children Staff need office area and room to meet with parents Add ESOL conference rooms and book storage; TAG storage Subtotal 3929 $676,755 0 12
Capital IV – High School Educational Specifications COST RELATED REVISIONS - continued Justification Proposed Revision Section 11 Building Services Provide rest rooms for visitors in proximity to main office; add space for easier support and maintenance of equipment. Increase space for book storage, custodial closets, IDF closets, and mechanical area; add rest rooms in lobby area To provide additional storage for baseball and softball teams Increase baseball / softball dugouts by 100 sf each Section 12 Outdoor Spaces Section 13 Career Tech Increase multi-purpose business lab and family consumer science storage Meet current GDOE requirements for lab and needed storage for class provisions and materials SubTotal 2291 $332,489 0 Total 6220 $1,009,244 0 13
Capital IV – High School Educational Specifications NON-COST RELATED REVISIONS Justification Proposed Revision Create direct access for students to Computer Rm. via Media Rm. and reduces IU by 1 Add door between relocated Computer Lab and Media Reading Room Section 3 Media Center Section 8 Admin Section 10 Nutrition Redesign existing space to allow for additional offices and storage Provide office space for itinerant support staff, and secure storage for testing materials Provide more efficient serving and decrease congestion for students who wait in line and need more time to eat at dining tables Redesign existing space to allow for additional serving line (4 lines to 5 ) Total 0 $0 -1
FCS – Educational Specification Work Session Education Specifications Design Requirements by Leonard Box 15 15 15 15
Capital IV – Design Guidelines The Proposed 2010 Educational Specifications provide descriptions of typical programmed spaces for each of the three main types of schools: Elementary, Middle, and High. Previous FCS Educational Specifications developed in 1997 include General Requirements. The Proposed 2010 Design Requirements expand on these. Most requirements are based on standards which have already been incorporated into the prototypical schools in order to maintain “Cost Neutrality”. Proposed revisions shown below are the exceptions which will impact construction cost beyond current prototypical schools.
Capital IV – Design Requirements Justification Proposed Revision Div. 2 – SITE These upgrades are included to ensure parity and standardization between future schools. Facilities at Athletic Fields provide by the Construction Contract have been expanded to include features previously provided at some, but not all schools High School Baseball Batting Cages (Qty 1) High School Softball Batting Cages (Qty 1) High School Practice Field Football Goals (Qty 2) Provide appropriate surfaces at pedestrian traffic routes To maintain attractive landscape appearance Div.5 – Metals Quality upgrade to avoid rusty steel rails which are difficult to properly re-finish. Railings: All interior and exterior hand rails shall be welded aluminum. High School Middle School Elementary School
Capital IV – Design Requirements Justification Proposed Revision Div. 8 –Doors & Windows Classroom window requirements at general instruction classrooms are similar to the previous Ed Specs. However, excessively large windows and windows with decorative applied mullions are specifically prohibited. This is a value engineering recommendation in order to provide specific instructions to future architects, to reduce construction costs and enhance maintainability. High School Middle School Elementary School Div.11- Equip. Theatrical/ Stage Equipment requirements are more specific than previous Ed Specs. Requires Architect to employ a qualified Stage Equipment Designer and incorporate equipment appropriate for each program into the construction contract, including, theatrical light fixtures. To provide the appropriate design expertise for equipment required and to avoid installation coordination problems through having equipment provided and installed by the building contract.
Capital IV – Design Requirements Proposed Revision Justification Score Boards were previously donated items. These upgrades are included to ensure parity and standardization between future schools. Div. 11 - Equip Provide complete Score Board systems in the at the following locations: High School Main Gym: (Qty – 2) High School Auxiliary Gym: (Qty - 2) Middle School Gym: (Qty – 2) High School Stadium: (Qty – 1) High School Baseball: (Qty – 1) High School Softball: (Qty – 1) These upgrades are included to ensure parity, standardization between future schools, as well as to limit the type of equipment allowed in concession buildings. Concession equipment was not specifically addressed in previous Ed Specs. Only utilities and the Ice Maker are provided by the Construction Contract. Appliances requiring a hood are not allowed. Div.11- Equip.
Capital IV – Design Requirements Justification Proposed Revision This feature will allow more specific analysis of electrical usage for potential efficiency improvements. Non-revenue Grade Power Metering: Not in previous Ed Specs. Proposed requirements are based on feedback from FCS Facilities Services. High School Middle School Elementary School Div. 16 - Electric
Capital IV – Design Requirements Justification Proposed Revision Proposed requirements are based on safety considerations. Div. 16 - Electric Solid Front Electrical Panels: Not in previous Ed Specs. High School Middle School Elementary School Div. 16 - Electric Future Expandability of electrical panels for future additions and portables. Proposed requirements to allow for energy saving considerations. High School Middle School Elementary School
Capital IV – Design Requirements Justification Proposed Revision Div. 16 - Electric Motion Sensors: Controls for lights when room is empty. Proposed requirements to allow for energy saving considerations. High School Middle School Elementary School Gym Lighting: Revise previous Ed Specs to incorporate use of T-5 High Output (HO) or induction fixtures in lieu of metal halide fixtures. Div. 16 - Electric Proposed requirements to allow for energy saving considerations. High School Middle School Elementary School Total All Div High School Total All Div Middle School Total All Div Elementary School
FCS – Education Specification Work Session 23 23 23 23
Educational Specification Work Session QUESTIONS ?? 24 24 24 24