YOU INSPIRE. WE ASPIRE. K B R ENGINEERING COLLEGE . 5 DAY WEEK PROPOSAL PRESENTATION . BY Mahendar Reddy Kura . Director. What is 5 Day Week…?. 5 Day Week means …. Monday to Friday working, week end Saturday and Sunday are Holidays. Why this 5DW.

sian
Download Presentation

YOU INSPIRE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. YOU INSPIRE WE ASPIRE

  2. K B R ENGINEERING COLLEGE 5 DAY WEEKPROPOSAL PRESENTATION. BY Mahendar Reddy Kura. Director

  3. What is 5 Day Week…? • 5 Day Week means …. • Monday to Friday working, • week end Saturday and Sunday are Holidays.

  4. Why this 5DW • Gives Extra Energy to Faculty & Student. • Accommodates More time to prepare. • Facilitates to learn other courses. • Finds time to attend personal works. • Improves attendance. • Compensates a day with any unexpected holiday. SATURDAY & SUNDAY HOLIDAYS …

  5. 6DW Vs 5DW HOURS COMPARISION 6DW – HRS / WEEK 5DW – HRS / WEEK • 6 DAYS X 7 HRS • = 42 HRS./WEEK. • 5 DAYS X 8 HRS • = 40 HRS / WEEK. • *( 2 Hrs Less than 6DW)

  6. Compare for a month 6 DW- HOURS IN A MONTH 5 DW- HOURS IN A MONTH • HOURS IN A MONTH = (4 Wks X 42Hrs) =168Hrs. Less 7 Hrs ( 2ndsatday is holiday).  (168 – 7 )=161 Hrs. • HOURS IN A MONTH = • 4 Wks X 40 Hrs • =160Hrs./month. • 5dw is one Hr shorter to 6dw per month.

  7. HOLIDAYS PER WEEK 6DW: 5DW • EVERY SUNDAY & 2ND SATURDAY IS HOLIDAY. • All BUNDHS are holidays & cannot be compensated. • : Every Sat-day and Sunday are holidays. • All Bundhs can be compensated with following sat-day as working day.

  8. 6DW-5DWTIME TABLES-A VIEW… 6 DW - TIME TABLE 5 DW - TIME TABLE HRFROMTO 1 9.00 9.50 2 9.50 10.35 10.35 10.45 BREAK 3 10.45 11.30 4 11.30 12.15 12.15 1.00 LUNCH 5 1.001.45 6 1.45 2.30 7 2.303.30 HRFROMTO 1 9.00 9.45 2 9.45 10.30 10.30 10.40 BREAK-1 3 10.40 11.25 4 11.25 12.10 12.10 12.40 LUNCH 5 12.40 1.25 6 1.25 2.10 2.10 2.20 BREAK-2 7 2.20 3.05 8 3.05 3.50

  9. STAFF - LEAVE POLICY 6DW EXISTING 5DW PROPOSED • 18 CLs PER YEAR. • Each leave worth =1/6 of “6Day-week”. 3x6day weeks=18 days. Hence 18 leaves in 6DW are equal to 15 leaves in 5DW. • 10 CLs PER YEAR, • Plus 5 MLs per Year which can be carry forwarded to next years if unused. • Each leave worth =1/5 of “5Day-week”.  3x5day weeks=15 days

  10. Salient features of 5DW. • Five day week. • Saturday & Sunday are Holidays. • 9 Am to 3.50 Pm. • 2 Breaks 10 minutes each. • Lunch break 30 minutes.

  11. 5DW features cntd… • 8Hrs X 45 minutes each. • Labs 2Hrs each. • Every day 6 subjects theory Hrs. • Extra slot can be used for Labs. • Break after Every 90 minutes.