Chapter 4 – Periodic Task Scheduling

Chapter 4 – Periodic Task Scheduling. In many real-time systems periodic tasks dominate the demand. Three classic periodic task scheduling algorithms: Time Line (Cyclic) Rate Monotonic Earliest Deadline First. What is the landscape here? What causes the challenges?.

signe-bowen
Download Presentation

Chapter 4 – Periodic Task Scheduling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 4 – Periodic Task Scheduling In many real-time systems periodic tasks dominate the demand. Three classic periodic task scheduling algorithms: Time Line (Cyclic) Rate Monotonic Earliest Deadline First What is the landscape here? What causes the challenges?

  2. Periodic Task Scheduling Notation Ti denotes the period of task i Cidenotes the Computation time for one instance of task i

  3. Periodic Task Scheduling Assumptions

  4. Additional Periodic Task Parameters

  5. < 1 if set is scheduable Processor Utilization Factor - U Let be the upper bound of the processor utilization factor for a set under a given algorithm A. When the set is said to fully utilize the processor. 1

  6. Time Line Scheduling (Cyclic Scheduling) 40 Hz 20 Hz 10 Hz Time Line Scheduling (Off-line scheduling strategy)– Divide the time line into time slices for scheduling tasks, e.g. use the Greatest Common Divisor of the Task Periods as the time slice: Schedulability is guaranteed if: Time line scheduling is sensitive to changes in the task parameters. Can time line scheduling also accommodate aperiodic tasks ?

  7. Rate Monotonic Scheduling RM is optimal among all fixed Priority assignment schedules. Why? How can you how show that it must be optimal?  Which is clearly non-optimal

  8. Rate Monotonic – Calc of ULUB for Two Tasks Let , the number of Then the schedule produced by RM satisfies one of two conditions: The critical time zone is for Uub

  9. Earliest Deadline First Proof: Assume U > 1 and the task set is schedulable. This leads to a contradiction:

  10. Example: Comparing RM to EDF Since U > ln 2 = 0.69, Schedulability can’t be guaranteed using Rate Monotonic

  11. Homework #4 Lecture 5/1 1) Verify the schedulability under RM of the following task set: 2) Verify the schedulability under EDF, and then construct the corresponding schedule. Due May 8

  12. Mutual Exclusion Problems

  13. Mutual Exclusion Problems

  14. Mutual Exclusion Problems

  15. Mutual Exclusion Problems

  16. Mutual Exclusion Problems • Priority Ceiling protocol: • The priority ceiling PC(S) is the highest priority of all processes that may lock S. • A task P that attempts to lock a semaphore will be suspended unless its priority is higher than PC(S) for all S currently locked by all tasks Q not= P. • If P is suspended, then the task Q that holds the lock with the highest PC is considered to be blocking P. Q then inherits P’s priority.

  17. Mutual Exclusion Problems

  18. Mutual Exclusion Problems Again, using Priority Ceiling