1 / 2

APPLICATION MIGRATION

ITC. Software. APPLICATION MIGRATION.

Download Presentation

APPLICATION MIGRATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ITC Software APPLICATIONMIGRATION ITC Software delivers automated migration solutions for cross-platform application and database conversion. We use unique tools and know-how that minimizes migration risks and reduces costs for our clients to a fraction of alternative migration approaches. Our customers come from diverse industries and include Fortune 500 companies. www.itcsoftware.com

  2. WHY MIGRATE SOFTWARE APPLICATION WITH ITC SOFTWARE? SIGNIFICANT REDUCTION OF THE PROJECT COST ITC Software’s automated migration reduces the migration project cost by more than 70% compared to the manual conversion. MINIMIZATION OF HUMAN ERRORS AND TESTING EFFORTS In general, manual conversion of software application is a routine and low productive task that leads to high probability of human errors. As a result a lot of efforts are required for testing. Automated solution substantially reduces the influence of human factor and, therefore, testing efforts. EASY RE-CONVERSION During the project, you can modify requirements based on the intermediate results (optimize database access, change UI features etc), and easily re-run the conversion. FLEXIBLE SOLUTION ITC Software’s automated solution is not limited to requirements set up at a start point of the project. These requirements can be changed and accepted during the project. FULL-CYCLE MIGRATION ITC Software’s services cover all the stages of migration process. This means that minimal input from the Customer is required during the project. RISK FREE AND QUALITY ASSURED DELIVERABLES We subject our software application migration solutions to comprehensive testing and validation procedures before delivering the results to the customer. We apply specific quality assurance methodology to ensure smooth and risk free migration process FEATURED CUSTOMERS HIGHLY AUTOMATED SOLUTION ~100 percent of conversion is realized automatically. This helps achieve handmade quality while minimizing human errors. INDIVIDUALLY TAILORED APPROACH ITC Software’s team approaches each migration project individually. Individual customization of our tools ensures meeting even very specific code generation requirements and guidelines. AUTOMATED VS. MANUAL MIGRATION Informix4GL PowerBuilder Java Progress 4GL Microsoft .NET CONTACT INFO Phone: +1 978 287 4855 info@itcsoftware.com www.itcsoftware.com • NOTE: with an increase in code lines number, the automated migration approach is becoming increasingly productive and cost-effective.

More Related