1 / 12

MEP Coordination Shop Drawing Service USA - MEPF, Mechanical, Electrical & Plumbing

Coordinating MEP systems with architectural and structural designs is a prime requirement in any of the approaches adopted by general contractors – be it design-bid-build or design-assist approach or design-build.

siliconllc
Download Presentation

MEP Coordination Shop Drawing Service USA - MEPF, Mechanical, Electrical & Plumbing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MEP BIM Coordination and Building Information Modelling Content are the contest remodel for AEC Professionals For any building construction project, more the building elements coordinate with each other; better are the chances of improvement in overall construction process. To attain a smooth workflow across construction projects, team management protocols amongst the architects, structural engineers, and MEP Professionals must be defined; like in Building Information Modelling. These well-defined BIM protocols contribute to standard flow of information within the professional from various disciplines and customize the workflow throughout. Architecture, Engineering and Construction (AEC) industry has a legacy of bringing various building design proposals on board, but amongst all these; MEP layout designs tend to fall way behind architectural and structural designs in timeline.

  2. MEP BIM Coordination and Building Information Modelling Content are the contest remodel for AEC Professionals Thus, coordinating continuous mechanical and electrical systems with customized configuration becomes a major challenge for MEP engineers. Advanced techniques like 3D CAD models of MEP layout can assist in layout visualization. However; they fall short in coordinating layouts for facilities of multiple complexities like hospitals, shopping malls and likes. A professional MEP design consultant having an expertise in BIM technology can help overcome the barrier and meet facility owners’ requirements. Thus, to coordinate continuous mechanical and electrical systems to detailed configuration becomes a major challenge for MEP professionals. Several advance techniques can assist in coordination but they still fall short in designing the layout for facilities of multiple complexities like hospitals, shopping malls and likes. A professional MEP design consultant can help overcome the barrier and meet the requirements of facility owners as well as general contractors.

  3. Challenges in construction planning without CAD and Building Information Modelling Coordinating MEP systems with architectural and structural designs is a prime requirement in any of the approaches adopted by general contractors – be it design-bid-build or design-assist approach or design-build. Shop Floor Drawings and specification inputs certainly deliver information about installation, however; information related to coordination of building elements is not easily available. Other drawbacks include lack of responsibility of engineering, design and detailing disciplines to define a fair track of changes; which leads to absence of inter disciplinary coordination. This may result in slower coordination which at later stages cause delays in critical time for MEP installation. Depending upon contractors’ knowledge for constructible design is a routine; but invites potential disputes if not resolved early in the design stage. All these shortcomings cumulatively restrict the growth of design evolution in building construction projects. It causes loss of resources, leads to rework, and consumes extra time causing the workers’ efficiency to hit new lows each day on project construction site.

  4. Information rich 3D BIM models are a strong foundation to erect facility Design BIM 3D Modeling itself is versatile and has the capabilities to detect clashes or interference in various building and MEP elements. Design clashes in any of the architectural, structural or MEP element layout can be immediately detected, reviewed and resolved instantaneously as they all work on a common data platform in BIM. Keeping a track of design changes, modification and review on each change by professionals in any discipline is judiciously maintained in common data environment – CDE. Change tracker with BIM gives transparency in developing a holistic project approach and makes the AEC professional to owe up to their changes in building construction design.

  5. MEP BIM Modelling Services

  6. MEP BIM Modelling Services

  7. MEP BIM Modelling Services

  8. MEP BIM Modelling Services

  9. BIM mitigates equipment installation and cost barriers Installation of several components in a congested area is a complex configuration to understand and causes countless hurdles such as overhead costs, damage to equipment etc. To reduce installation costs; general contractors often make changes during the construction phase to meet the spatial arrangements. But when the design planning is conducted on a shared environment with BIM right from stage zero of planning, last minute design changes are minimized. An architect with MEP contractors can finalize, adjust and coordinate the design during early stages depending on the availability of floor area. MEP components and HVAC units are usually bulkier in size and need frequent maintenance. Thus, it becomes critical to plan their placement such that they are easy to access and do not disturb the structure of facility. By early accommodation of MEP layout in facility design gives architects, structural engineers and MEP professionals the scope to coordinate their designs well, and eliminate expensive reworks.

  10. BIM content of building products, Extra support for coordination of building elements With initial design migration to CAD, 2D drawings surely imply the graphic design but require interpretation of designs in 2D format. Initially when Architecture, Engineering and Construction (AEC)design professionals migrated to CAD, 2D drawings did imply digital graphics, but still required interpretation of lines. Not much design automation was possible because of limited drafting aid. On the other hand, 3D CAD models offer the analysis of spatial requirements and exact geometry through solid modeling. This eases the explanation of design intent to individual stakeholders and makes design data addition to as-built models of building structures. Furthermore, developing BIM content of these readily available 3D CAD models of building components gives insights of spatial arrangements. Insights so developed will empower architects, structural engineers and MEP engineers to plan their respective designs which will cause minimum clashes and installation probole

  11. Contact US Silicon Engineering Consultants LLC 11670 Fountains Drive, Suite 200, Maple Grove, Minnesota - 55369 USA : +1 (763) 270-8285 Email : info@siliconconsultant.com

More Related