Belgrade Chamber of Commerce Cluster Club Project – WP5 Pilot Project - Mini marina Conceptual solution with economic and feasibility study. Milan Vlahovic PMP. Activities of Belgrade Chamber of Commerce within WP5-Development of Pilot Actions.

simeon
Download Presentation

Milan Vlahovic PMP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Belgrade Chamber of CommerceCluster Club Project – WP5 Pilot Project - Mini marinaConceptual solution with economic and feasibility study Milan Vlahovic PMP

  2. Activities of Belgrade Chamber of Commerce within WP5-Development of Pilot Actions • The feasibility study for the creation of a river mini-marina in Serbia in accordance with the EU standards • The proposal for conceptual layout and feasibility study was put out to tender according to the project plan • Among prequalified selected firms, firm “DAAM” had the lowest tender and was contracted to do the job

  3. Development of the conceptual solution with the economic and feasibility study of the mini marina project on the river Sava on the territory of the Surčin municipality • a multi disciplinary team was assembled • the team consisted of 17 smaller teams,among them: • architectural and construction team • environmental team • team for energy efficiency and alternative energy sources • feasibility study team

  4. Basic principles of design • Preservation of the environment – with minimal pollution • Energy efficiency - the use of renewable energy sources • Integration in urban and natural environment • Rationality and functionality in architectural design • Use of preferably natural materials such as wood • Adjustment of construction costs and use of reasonable and realistic possibilities

  5. Urbanandtechnicalanalysisof the marina “Surčin” location • The selected location of a marina on the river Sava left bank on the territory of Surčin municipality was already anticipated in theland use plan of the municipality of Surčin • It has a number of benefits for recreation, tourism, fishing and hunting • According to requirements of the Surčin land use plan, it is necessary to establish the concept of protection and regulation of river water and river banks

  6. The potential for tourism development • The possibility of building a pier for tourist and recreation boats and ships, the proximity of touristic location Obedska bara • Outstanding values and natural beauty, environmental benefits and values for the development of weekend and recreation tourism, especially in Progar, Boljevci and Jakovo • Outstanding traffic position, primarily on the international infrastructure corridor 10

  7. Site plan of marina “Surčin” location • Position of location • 1km downstream from the Obrenovac bridge, • 13km upstream from the Sava river mouth, • 6km by local road fromSurčin Belgrade Surčin

  8. Photodocumentationoflocation

  9. The most frequent functions of typical marina ? • Information on existing facilities in marinas in the United States gathered in about 4500 marinas: • boat places100% • halls for winter boat places70% • facilities for boat transport77% • boat and motor repair and maintenance service60% • gas stations74% • sales of a boats, motors and trailers50% • sales of boat accessories50% • sales of ice, fishing supplies, baits, etc67% • sales of food5% • boat chartering46% • room facilities for personnel77% • beverage service70% • snack rooms30% • restaurants21%

  10. What should be included in mini marina? • Management with a view over the port area with bulletin boards, with features for providing information on different topics (wind, water levels, advice fordriving, ...) • Enough space for berths for boats of various dimensions within the pier • A device for pumping motor fuel for boats, sailboats • Devices for transporting boats on land and in water direction and for boatextractionfrom the water • Winter storages for boats in the open air or in the halls • A devices for maintenance and repair of boats • An opportunity to purchase replacement parts and accessories for boatsand yachts • A saving and rescue service • Organizing sailing courses and courses for driving motorboats, learning and teaching of scuba diving and water skiing • Basic hospitality and tourist facilities (restaurant, coffee bar on the water,tourist office etc.)

  11. Additional facilities in a good marina? • A promenade with benches • Areas for sport and recreation, playgrounds for children • Motel or hotel departments, apartments for rent or bungalows • A pier for liners, for charter rides and crews of big sailing ships

  12. Marine zone Hotel and restaurant Service zone Sports and recreations zone Green area Parking zone Winter boat storage

  13. Standardization • Design was made to meet EU standards for that type of club marinas • According to the national regulations and standards for the classification of marinas (Official Gazette RS no. 56/2011) the Surčin marina will have the highest category of 4 anchors • The facilities are designed to a high standard of thermal protection

  14. The position and orientation of facilities and the shaping of architectural resources are suitable for an energy-efficient systems with renewable energy • Photo-voltage system • Wiessmann earth-water heat pump • The project sought to maximize the nature preservation and enhancement and to minimize the impact on the natural ecosystem

  15. By using solar energy (photovoltage panels) and earth (geosondes and heat pump) the facilities will be heated, cooled and ventilated with minimal impact on nature. • No emissions gas and other pollutants. • One of the biggest potential contaminants and risks of pollution in coastal areas are the sewerage system and waste water technology that marina creates. • On this matter, a particular account was taken through the prediction and determination of all the systems that purify wastewater and return it as a technical water for use in the service and land surfaces

  16. Feasibility study • The implementation of the marina can be carried out in three stages . • The first stage includes primary activities related to the water facilities (the part of the pier with berths) and the management part of the facility, service building, water gas station and apart of the covering infrastructure. • The second phase includes a restaurant and a part of the pier, landscaping and infrastructure. • The third stage would be carried out with theconstruction of a covered boat winter storage, the hotel and the boat docks.

  17. MARKET ANALYSIS FOR BOATS IN BELGRADE

  18. FEASIBILITY STUDY (PHASE 1) • PHASE 1: • Investment size: 1,600,985 EUR • Net Present Value = 394,430 EUR • Internal Rate of Return = 11.91% • Payback period = 7.4 years

  19. FEASIBILITY STUDY (PHASE 2 and PHASE 1) • PHASE 1 AND PHASE 2: • Investment (Phase 1 and Phase 2): 2,976,443 EUR • NPV = 731,238 EUR • IRR = 12.20% • Payback period = 6.6 years

  20. FEASIBILITY STUDY (PHASE 3 and PHASE 1+PHASE 2) • PHASE 1+2+3: • Investment Phase 1+2+3: 4,600,501 EUR • NPV = 1,177,254 EUR • IRR = 12.29% • Payback period = 6.5 years

  21. GRAPHIC PRESENTATION OF CONSTRUCTION PHASE

  22. Feasibility study findings • Based on the market analysis, the demand for the mini marina and adjacent facilities is present in Belgrade. • The envisioned marina in the Surčin municipality should provide slips and gas station for river boats, along with the modern facilities such as restaurants, hotel and recreational facilities. • The Phase 1 profitability enables the stakeholders to seek the additional funds from commercial banks, bond issuance or any other form of borrowed capital in order to build Phase 2 and Phase 3 • The feasibility study for Phase 1, as well as feasibility study for the other two phases has provided positive findings in terms of profitability and self-sustainability

  23. Thankyou for your attention!