10 likes | 271 Views
Baytown Hot-work at Dock 5, Berth 6 monopile. Replacement of the 6 berth mono-pile is scheduled to begin March 4th 2013 Work will continue for approximately 15 days Will require strict adherence to hot work procedures while vessels are alongside and hot work is being done
E N D
Baytown Hot-work at Dock 5, Berth 6 monopile • Replacement of the 6 berth mono-pile is scheduled to begin March 4th 2013 • Work will continue for approximately 15 days • Will require strict adherence to hot work procedures while vessels are alongside and hot work is being done • Under no conditions will hot work be performed within 100 feet of the cargo hoses or the PV valve on vessel • No Hot work will be done on weekends or when a ship is on 6 Berth.