1 / 2

MB – NG SuperJANET4 Development Network (22 Mar 02)

RAL OSM-4GE-WAN-GBIC. MCC OSM-4GE-WAN-GBIC OSM-1OC48-POS-SS. UCL OSM-4GE-WAN-GBIC OSM-1OC48-POS-SS. RAL OSM-4GE-WAN-GBIC OSM-1OC48-POS-SS. SuperJANET4 Production Network. UCL OSM-4GE-WAN-GBIC. MB – NG SuperJANET4 Development Network (22 Mar 02). WorldCom. SJ4 Dev C-PoP

sitara
Download Presentation

MB – NG SuperJANET4 Development Network (22 Mar 02)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RAL OSM-4GE-WAN-GBIC MCC OSM-4GE-WAN-GBIC OSM-1OC48-POS-SS UCL OSM-4GE-WAN-GBIC OSM-1OC48-POS-SS RAL OSM-4GE-WAN-GBIC OSM-1OC48-POS-SS SuperJANET4 Production Network UCL OSM-4GE-WAN-GBIC MB – NG SuperJANET4 Development Network (22 Mar 02) WorldCom SJ4 Dev C-PoP Warrington 12416 OC48/POS-SR-SC MAN OSM-4GE-WAN-GBIC Leeds Gigabit Ethernet 2.5 Gbit POS Access 2.5 Gbit POS core MPLS Admin. Domains SJ4 Dev ULCC 12016 SJ4 Dev C-PoP Reading 12416 SJ4 Dev C-PoP London 12416 OC48/POS-SR-SC OC48/POS-LR-SC ULCC WorldCom WorldCom Dark Fiber (SSE) POS MB-NG Mar 2002 R. Hughes-Jones Manchester

  2. Some Notes • This is very much the current view and not a final view. It needs discussion/agreement by the MB-NG collaboration. • The diagram should be read in conjunction with Ian’s kit list. • The 12016 GSR at ULCC is an extension of the SJ4 development core. • It is likely that the MB-NG project will need to have exclusive use of the 12016 in a similar way to that proposed for the SJ4 development core. The reasons include: • Possible IP / QoS configuration conflicts • Possible MPLS configuration conflicts • Uniformity / special versions of Cisco software • The OC48X/POS-S(L)R-SC interfaces in the core GSRs are included in the MB-NG project. MB-NG Mar 2002 R. Hughes-Jones Manchester

More Related