Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004. Instrumentation Priorities – My Perspective. NUMI tasks (struggling to identify the target and really get going) TEV BPMs project (needs increased AD attention)
E N D
Instrumentation -- present and future (Jean’s title)Bob WebberAccelerator Run II MeetingThursday, January 8, 2004
Instrumentation Priorities – My Perspective • NUMI tasks (struggling to identify the target and really get going) • TEV BPMs project (needs increased AD attention) • Rapid Transfer Line BPMs (no one presently assigned) • Recycler BPM finish-up (just to wrap it up) • Pbar Flying Wires (just to get it done) • SY-120 (except BPM front-end) • Flying Wire and Synch light front-end upgrades (for SDA robustness) • Flying Wire performance analysis (on going) • BLT standardization and robustification • Toroid signal integration and readout upgrades • TeV IPM • Accumulator BPM MOOC/ACNET upgrade • (MI BPMs hardly even make my list) • Tevatron BLM system at some priority (since I first made this list)
Instrumentation Department Organization BPMs, BLMs, Intensity Monitors Software, BLTs, SBDs, FBIs Multiwires, Switchyard Flying Wires, IPMs, Synch Light
Current Activities MI DCCT, toroid electronics MI DCCT, mentoring Spare BPMs BPM, BLM maint. RR, NUMI, and TeV BPMs, QXR, Temp/Humidity A1, P1 BPMs SBDs Synch light, BLMs, Flying Wires, SBDs Synch light, BLTs FBIs, DCCTs BLTs, OTR r&d RR BPM, Back Door, Accum BPM SY120 support, NUMI TLMs, NUMI profile monitors Pbar Flying Wires, TeV IPM
Priorities vs. Assignments • Priorities and current assignment of manpower are not necessarily self-consistent • due to the skill mix and operational maintenance responsibilites of individuals within the Department. • Some projects are not being worked on at the level of effort that task prioritization would indicate appropriate. • That's why you might judge some things in above list as not properly prioritized; they just end up being high priority for persons less well qualified for other things. • Sad but true.
Collaborations/Outside Contributors • PPD – Flying wires, multiwires, electronics assembly, synch light, Flying Wire PMT and OTR mechanics • CD – Tev BPM project, Recycler BPMs • University of Texas – NUMI profile monitors • POST-PRESENTATION ADDITIONS: • I failed to acknowledge that the Instrumentation Department also receives critical support and cooperation from the AD Controls, Mechanical Support, and RF Departments • I did mention at the meeting, although not included in these slides, that much instrumentation work is also done to varying degrees by each of the machine systems departments.
What Worries Me • NUMI tasks (struggling to identify the target and really get going) • TEV BPMs project (needs increased AD attention) • Rapid Transfer Line BPMs (no one presently assigned) • Pbar Flying Wires (just to get it done) • SY-120 (continued maintenance of disparate systems) • BLT standardization and robustification • Accumulator BPM MOOC/ACNET upgrade • Tevatron BLM system at some priority (since I first made this list) • (MI BPMs hardly even make my list)